PURCHASE DESCRIPTION

L7WC02 B670 Paint Booth and HVAC

20 October 2026

1.0 DESCRIPTION. The Contractor shall provide all the tools, parts, materials, equipment, labor, transportation, training, and installation of a new Carrier makeup air unit/condenser, new duct work, HMI control system, interlocking working and breathing air, and new side access door for the paint booth in Building 670 to the 402d Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia.

1.1 Detail the Commodity/Deliverables:

1.1.1 The Contractor shall contact Government point of contacts (POC) in section 2.1.1 to establish a site visit within 3 days of contract award. 1.1.2 The Contractor shall provide a work plan within five days of site visit for the makeup air unit/condenser, control system and extend concrete pad (if needed) for the paint booth in Building 670. The work plan needs to describe the efforts in detail. The Contractor shall email the work plan to the Government POCs listed in section 2.1.1. (CDRL A001 DI-MGMT81911/T, Work Management Plan). 1.1.3 The Contractor shall coordinate the written approval of the said part(s) via a design/drawing for the Government Representative(s) prior to installation within 14 days of contract award. All replacement part(s) furnished by the Contractor shall be new OEM compatible components that meet or exceed OEM specifications and include but limited to the following: (CDRL A002 DI-SESS-81002F/T NOT 2, Design/Drawing)
1.1.3.1
The Contractor shall provide written notification to the Government Representative(s) via email within one (1) day of knowledge concerning lack of availability and/or delays for any replacement part(s) and include part(s) number/name and any available resolution(s) relative to the generator part(s).
1.1.3.2
The Contractor shall not substitute the OEM replacement part(s) without notification and/or approval of the Government Representative(s). 1.1.4 The Contractor shall demolition and dispose of the following: 1.1.4.1
Current 100-ton paint booth HVAC system
1.1.4.2
Current duct work to the paint booth
1.1.4.3
Current electrical wiring to the HVAC system
1.1.4.4
Side door to paint booth
1.1.5 The Contractor shall install a new Carrier 100-ton system. Unit is to have: 1.1.5.1
HVAC system must be a Carrier brand at least 100-ton
1.1.5.2
Must maintain a temperature of 75ºF ± 5ºF year round
1.1.5.3
Must maintain a humidity of 50% ± 10% @ 75ºF year round 1.1.5.4
Airflow must maintain an average cross-sectional velocity of at

The beginning of the document. Download the full file to read on.