Lead in Paint test results
Updated
A PDF document (216 KB) attached to Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation, from the Department of the Army. Due Oct 30, 2026, 1:00 PM (UTC-8).
File name: Lead in Paint test results.pdf
The full file is for paid members, or buy this bid alone.
Preview
Eurofins Built Environment Testing
3113 Red Bluff Road Pasadena, Texas 77503
Phone: (713) 290-0223 – Fax: (832) 831-5669
www.EurofinsBuiltEnv.com
Lead in Paint Performed by
Flame AA – USEPA SW846 7000B/3050B (Mod.)
Order #:
Project #:
Receipt Date:
Analysis Date:
Report Date:
Mike Lawrence
Now Environmental Services
34009 9th Ave S, Suite A12
Federal Way, WA 98003
4601950
S26-0509
30-Jun-2026
6-Jul-2026
6-Jul-2026
USACE Dworshak Project
SAMPLE
ID
PAINT
COLOR
LEAD
CONCENTRATION
(ppm)
LEAD
CONCENTRATION
(%)
L1
Grey
< 50
< 0.005%
Reporting Limit = 50.0 ppm N/A = Not Applicable
INS = Insufficient Sample Weight NS = Not Submitted
Analyst: Alexander Benavidez
Scott Ward, Ph.D. Lab Director
Results apply to the sample as received and relate only to the items tested. The analysis has been conducted according to the method(s) listed above. Blank corrections are not applied to data unless requested by the customer. This report is for the exclusive use of the addressed customer and shall not be reproduced except in full without written approval by Eurofins J3 Resources, Inc. (EJ3). EJ3 is an EPA NLLAP recognized lab by the AIHA-LAP, LLC ELLAP (Lab ID: 157714). Unless otherwise noted, all quality control samples performed within specifications established by the laboratory. The estimated accuracy is solely based on recovery data from internal laboratory control samples at the 95% confidence interval (k = ~2) of the level of concern, derived from a 336.9 mg/Kg lead in paint certified reference material. The estimated accuracy does not account for uncertainty associated with the sampling process. Accuracy = +/-13%
The beginning of the document. Download the full file to read on.