LOE Instructions
Updated
A PDF document (339 KB) attached to Solicitation - Aberdeen Test Center Welding, Machining, Painting, and Fabrication Services, from the Department of the Army. Due Nov 17, 2026, 12:15 PM (UTC-5).
File name: LOE Instructions.pdf
The full file is for paid members, or buy this bid alone.
Preview
1. GENERAL
Each offeror is to provide a price proposal and accompanying narrative as part of their proposal in response to the solicitation. FAR 15.403-5(b) allows the contracting officer to specify the format of cost or pricing data or data other than certified cost or pricing data. The completed workbook shall be part of the price proposal. This is a required flow down requirement, and therefore shall be submitted for the prime offeror AND for any and all divisions and subcontractors proposed to perform effort in response to this solicitation. The information will be evaluated for fairness, reasonableness, based on the price analysis.
2. OVERALL INSTRUCTIONS
1. The worksheets are designed to automatically compute and populate other cells in the Excel workbook.
2. The worksheet tabs shaded green have inputs required on that worksheet. 3. More detailed instructions follow number 9 below.
4. Type the appropriate name of the Prime Contractor/Subcontractor/Division in Cell H14 on the Instructions worksheet of the LOE Workbook. It will carry through the remaining worksheets.
5. Please enter the requested data in the green shaded areas on the Direct Labor Rate Schedule, which includes the proposed labor rates, the basis for the rate proposed and the escalation rate used. The direct rate information feeds into the Labor Detail worksheet. 6. Please enter the requested data in the green shaded areas on the Labor Detail worksheet, which includes which entity will be performing the work (columns D and E). Column L will only need inputs if the prime offeror is inputting a subcontractor’s fully burdened labor rate into that column.
7. Please enter the requested data in the green shaded areas on the ODC Detail worksheet. For the purposes of proposal, the Government has input normalized values for the ODCs. These numbers are to be used. The offerors may add any burden and/or G&A as appropriate. Since these are estimated amounts that may or may not occur, no fixed fee will be allowed on the ODCs.
8. Please enter the requested data in the green shaded areas on the Indirect Rate Summary worksheet.
9. Please enter the requested data in the green shaded areas on the Fringe, Overhead, and G&A worksheets. These worksheets assist in calculating the indirect rates. This will enable the price evaluation team to analyze the indirects. PLEASE NOTE: The rates at the bottom DO NOT carry over to the Indirect Rate Summary.
3. SECTION B WORKSHEET
The Section B worksheet imports data from the Price Summary, Labor Detail, and ODC Detail
The beginning of the document. Download the full file to read on.