Home / 7th Fleet Welder Qualification and Sustained Capability… / Document

LWT 042-001

Updated

A PDF document (62 KB) attached to 7th Fleet Welder Qualification and Sustained Capability Program, from the Department of the Navy. Due Nov 15, 2026, 11:00 AM (UTC+9).

File name: LWT 042-001.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SHIP:

N/A

COAR:

LOCAL WORK TEMPLATE

<<INSERT ACTIVITY>>

ITEM NO:

042-00

N/A

PCN:

N/A

LWT FILE NO:

042-001

CMP:

N/A

REVISED:

31 OCT 2025

PLANNER:

N/A

1.

SCOPE:

1.1 Standard Welding Procedure Specification for Naval Applications; procure and demonstrate
1.2

Location of Work:
1.2.1

1.3

Contractor Facility

Identification:

1.3.1 AWS-NAVSEA B2.1-1-302:2015 Standard Welding Procedure

Specification for Naval Applications for Naval Applications for Shielded Metal Arc Welding of Carbon Steel (S-1), 1/8" [3 mm] through 1-1/2" [38 mm] Thick, MIL-7018-M, in the As-Welded or PWHT Condition, Primary Plate and Structural Naval
1.3.2 Carbon steel (S-1) test assembly weldment, approximately 1/2 in X 14 in X 15 in.

2.

REFERENCES:

2.1

FY 26 CH-1, Standard Items

2.2 AWS-NAVSEA B2.1-1-302:2015, Standard Welding Procedure Specification for Naval Applications for Naval Applications for Shielded Metal Arc Welding of Carbon Steel (S-1), 1/8" [3 mm] through 1-1/2" [38 mm] Thick, MIL-7018-M, in the As-Welded or PWHT Condition, Primary Plate and Structural Naval
2.3 S9074-AQ-GIB-010/248 Rev 1, Requirements for Welding and Brazing Procedure and Performance Qualification
2.4

MIL-STD-22D, Welded Joint Design

2.5 MIL-STD-1689 Rev A, Fabrication, Welding, and Inspection of Ships Structure
2.6
3.

MIL-STD-2035 Rev A, Nondestructive Testing Acceptance Criteria

REQUIREMENTS:

3.1 Procure the Standard Welding Procedure Specification for Naval Applications (SWPS-N) identified in 1.3.1 for the demonstration and testing of the test assembly weldment of 1.3.2. See Note 4.1. 3.1.1 For each SWPS-N, the contractor performing the welding shall enter the name of the contractor and each fabrication document on the SWPS-N for which the SWPS-N will be used. All SWPS-N requirements shall be met and those requirements shall not be modified 3.1.2 Submit one legible copy, in approved transferrable media, of a signed copy of the SWPS-N to the SUPERVISOR. Document in Enclosure (One).

ITEM NO: 042-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2 Personnel welding SWPS-N verification welds shall be regular employees of the contractor (i.e., not subcontractors or temporary specialists) and under the full supervision and control of the activity.

The beginning of the document. Download the full file to read on.

Other documents in this bid