Home / MDA Advisory & Professional Support Services (MAPSS) / Document

MAPSS Tranche 2 Industry Day Approved

Updated

A PDF document (1.8 MB) attached to MDA Advisory & Professional Support Services (MAPSS), from the Missile Defense Agency (MDA). Due Dec 31, 2027, 4:30 PM (UTC-6).

File name: MAPSS Tranche 2 Industry Day_Approved.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Missile Defense Agency (MDA)
Advisory & Professional Support Services (MAPSS)
Tranche 2 Industry Day Webinar

Approved for Public Release
26-MDA-12357 (10 Jun 26)

Tranche 2 Requirements

Facilities Lifecycle
Management (FLCM)

Vehicle: OASIS+ T&E Unrestricted | FTE Range: 45-50
NAICS: 541330 | Contract Type: FFP Consumption Based

Vehicle: OASIS+ Total SB Intel Domain | FTE Range: 130-140

Security

Intelligence

Test Support

NAICS: 541690 | Contract Type: FFP Consumption Based

Vehicle: OASIS+ Total SB Intel Domain | FTE Range: 55-65 NAICS: 541690 | Contract Type: FFP Consumption Based

Vehicle: OASIS+ Total SB R&D Domain | FTE Range: 240-260 NAICS: 541715 | Contract Type: FFP Consumption Based

Projected Tranche 2 Schedule
Requirement

Draft FOPR

FOPR

Award

FLCM

July 2026

Oct 2026

May 2027

Security

July 2026

Nov 2026

June 2027

Intelligence

July 2026

Oct 2026

May 2027

Test Support

Aug 2026

Dec 2026

July 2027

• Draft Fair Opportunity Proposal Requests (FOPR):
•
•
•
•
•

Address any questions, refine requirements, identify technical ambiguities Allow Industry time to build teaming arrangements
All Q&A will be provided as an attachment on the FOPR
Anticipated to be posted for 10 business days

FOPR

• Contains all terms and conditions relevant to specific procurement • Utilize Highest Technical Rated Offeror acquisition methodology • Anticipated to be posted for 5 weeks

Organizational Conflict of Interest (OCI)
Guiding Principles
• Consistent with DoW policy, MDA requires support from sources that are objective and unbiased
─ MAPSS Systems Engineering and Technical Assistance (SETA) listing

• MAPSS OCI Guiding Principles establish restrictions & exclusions for primes & subcontractors
─ Restricted contracts have identified conflicts with other TEAMS Next and/or MAPSS contracts; Conflicts must be avoided, neutralized, or mitigated through an acceptable mitigation plan to be eligible for the contract award
─ Exclusive contracts have identified unmitigable conflicts with all other MDA contracts and other agency issued contracts funded by MDA

• Conflicts may also exist between MAPSS contracts and other A&AS contracts awarded by other Agencies in support of MDA (ex: Interagency agreements)
• Industry is strongly encouraged to review RFO, DFARS RFO, and relevant GAO/court cases in addition to taking an active role in OCI management

Facilities Life-Cycle Management

(FLCM)

FLCM Functional Mission

Site, acquire, deploy, and manage the design and construction of

The beginning of the document. Download the full file to read on.

Other documents in this bid