REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE

This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future.
NAICS Code: 237110 – Water and Sewer Line and Related Structures Construction (Note: While Other Transaction Authority is not subject to FAR-based small businesIntells regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million

PROJECT OVERVIEW

The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of a project to restore and modernize the potable water system and wastewater collection system throughout the Fort Hunter Liggett Installation. The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional and modernized potable water and wastewater systems on the Installation. The Fort Hunter Liggett water distribution system dates back to the 1950’s with a few areas believed to be even older and includes a three (3) well configuration that has sufficient pumping capacity to serve current supply demands, however, the water transmission system is undersized to satisfy the demand of the system.
While the current water system storage may be sufficient for normal operation, it cannot sustain the system for more than one day in the event of a pump outage and/or fire flow event during maximum day conditions; therefore, additional system storage is necessary. A new Tank Farm with adequate storage capacity (estimated to be a minimum of 2 million gallons) to be determined and validated in accordance with NSPC, UFC, and NFPA criteria, should be in vicinity of security fence gate 10 (Lat: 35.997638° , Long: -121.224355°). Currently the primary storage tank for the potable water system is on the opposite side of the

The beginning of the document. Download the full file to read on.