Home / Market Intelligence Questionnaire JBR041 – Pallet… / Document

Market Intelligence Questionnaire JBR041 and JBR044 RTA

Updated

A PDF document (831 KB) attached to Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility, from the Department of Defense. Due Oct 29, 2026, 2:00 PM (UTC-8).

File name: Market Intelligence Questionnaire JBR041 and JBR044_RTA.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Comprehensive Market Intelligence Ques onnaire
Project Delivery & Acquisi on Strategy

Origina ng Agency

U.S. Army Corps of Engineers / Alaska District

Document Type

Sources Sought / Request for Informa on (RFI) Template

Target Audience

Project Delivery Teams (PDTs) & Industry Partners

Classifica on

Unclassified / Pre-Solicita on

Market Intelligence Ques onnaire | Project Delivery & Acquisi on Strategy

1. Project Informa on Packet (PIP)

Project Overviews & Constraints
JBR041 – Pallet Processing Facility
Project Name
Loca on
Site Characteriza on
Mission Statement

Pallet Processing Facility (JBR041)
JBER-Richardson, Alaska
Project is located within the secure facility perimeter, on both Greenfield and previously developed lands, and in Climate Zone 7. This project is required to provide a fully enclosed, all-weather, 24hour Pallet Processing Facility opera on that will serve as the only hazardous cargo processing point and consolidated alert final prepara on and holding area at JBER. The facility will play a cri cal role in suppor ng the deployment of Airborne forces, as well as subsequent power projec on of follow-on forces and equipment.

Facility Type & Scale

Pallet processing facility of approximately 52,000

Primary Func onal Spaces

Spa al requirements: including administra ve office space for 6 personnel: 1 supervisor (138 NSF office), and 5 administrators (96 NSF office each). Warehouse floor personnel would consist of a maximum of 30 military personnel. Opera ons Control Center of approximately 2,500 square feet. Explosives stored in the facility would always be guarded and monitored by military staff. This opera onal procedure eliminates the need for an IDS pla orm. Addi onal space requirements included 463L pallet storage racks, a carpentry shop equipped with heavy cu ng tools (such as radial long saws and table saws), NIPR and SIPR connec vity, three 480V forkli s with chargers, and material storage and handling areas. The facility design would include one interior drive though lane for trucks and one lane with loading dock capabili es featuring a rollerized scale for a three-pallet train. The central area of the facility would be used for material storage and handling, while the peripheral wall areas would be designated for pallet material storage.

Funding Type

MILCON

Target Budget (CCL)

$79.5M

Period of Performance

FY29 – FY32

Cri cal Milestones

Design Start in FY29 Q1, Construc on start in FY30, 24 month construc on period

Market Intelligence Ques onnaire | Project Delivery & Acquisi on Strategy

The beginning of the document. Download the full file to read on.