Market Intelligence Questions
Updated
A PDF document (93 KB) attached to F-15EX 8-Bay Maintenance Hangar Complex-Industry Day, from the Department of the Army. Due Dec 1, 2026, 2:00 PM (UTC-5).
File name: 20261028 Market Intelligence Questions (Final).pdf
The full file is for paid members, or buy this bid alone.
Preview
Market Intelligence Questions
Project: F-15EX 8-Bay Maintenance Hangar Complex
Location: Selfridge Air National Guard Base, Harrison Township, Michigan Estimated Magnitude: $150 million–$200 million
North American Industry Classification System (NAICS) Code: 236210, Industrial Building Construction Commercial and Institutional
Project Details
•
Requirement: The 127th Wing requires an adequately sized, properly configured, environmentally safe, and energy-efficient aircraft maintenance hangar complex and maintenance shops, in support of 21 Primary Aircraft Authorization (PAA) F-15 EX aircraft. Functional areas include bay space for maintenance and fuel cell / corrosion control, general maintenance shops, administrative, training, equipment and material storage, and clean/dirty transition space as well as utility and infrastructure upgrades necessary to support construction of the complex.
•
Details on Proposed Construction: Construct an aircraft maintenance hangar complex, utilizing conventional design and construction methods to accommodate the mission of the 127th Wing. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Special Construction Requirements: Specialized foundation and facility requirements necessary to meet flood plain requirements. Construction may be phased into three separate phases. The first would be “Hangar 1” which includes a 2-Bay Corrosion Control and Fuel Cell Hangar. The second phase would be “Hangar 2” which includes a 4-Bay Maintenance Hangar (over the former Hangar 3 footprint). The third would be “Hangar 6” which includes 2-Bay munitions and training (over the former Hangar 5 footprint). The order and scope of the phases may be adjusted prior to the completion of the design. Includes demolition of multiple facilities including buildings 3, 5, 117 and 120. New parking will be constructed in the footprint of the buildings 117 and 120.
Planned Acquisition Approach Under Consideration:
The National Guard Bureau is considering procurement of a fixed-price agreement utilizing an Other Transaction Agreement (OTA) under the authority of 10 U.S.C. § 2808a. This authority establishes a dedicated, independent Other Transaction (OT) authority specifically for facility construction and military construction (MILCON) or repair projects.
The beginning of the document. Download the full file to read on.