MDI Van Support Statement of Objectives
Updated
A PDF document (489 KB) attached to : Mobile Diagnostics and Integration (MDI) Service Support, from the Department of the Air Force. Due Oct 30, 2026, 1:00 PM (UTC+1).
File name: MDI Van Support SOO.pdf
The full file is for paid members, or buy this bid alone.
Preview
Statement of Objectives: Mobile Diagnostics and Integration (MDI) Service Support
1.0 Purpose
The purpose of this SOO is to obtain comprehensive lifecycle support, vehicle modifications, training, and logistical sustainment for the Mobile Diagnostics and Integration (MDI) van fleet.
2.0 Scope
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform remote and OCONUS maintenance, parts warehousing, ATTLA certification, and system training for the MDI platforms supporting the 435th Air Ground Wing Operations (435 AGOW). Services will exclude coverage for both mechanical and cosmetic issues affecting the vehicle, including but not limited to the engine, transmission, suspension, bodywork, paint, interior and exterior finishes. However, service will cover the maintenance, repair, and upkeep of any modifications and modification materials made to the vehicle that are directly related to the services requested above.
3.0 Period of Performance
The anticipated Period of Performance shall consist of one (1) 12-month Base Year and two (2) 12-month Option Years.
4.0 Place of Performance
Work shall be conducted at the contractor's facilities (for remote diagnostics, engineering, and off-site warehousing) and on-site within the United States Air Forces in Europe - Air Forces Africa (USAFE-AFAFRICOM) area of operations. All in-person service visits, vehicle modifications, and training evolutions shall occur within the USAFE-AFAFRICOM AOR as dictated by mission requirements.
5.0 Technical Objectives
The Government requires industry to develop a Performance Work Statement (PWS) that meets or exceeds the following performance objectives:
Objective Area
Expected Outcome / Requirement
Field Service &
Maintenance
Provide up to 500 hours of service labor, including remote diagnostics (phone/video) and up to ten (10) Europe-based in-person service visits. Visits must cover up to five (5) days (including travel) to repair, modify, or maintain inoperable vans.
Logistics &
Warehousing
Procure, manage, and provide off-site storage for 115 comprehensive modification material replacement kits (comprising the 102 line items detailed in Appendix A). Ensure capability to ship these materials to 435 AGOW within a two (2) week timeframe. Provide six (6) complete sets of specialized diagnostic tools.
Air Transportability
Certification
Finalize, implement, and secure official Air Transportability Test Loading Agency
The beginning of the document. Download the full file to read on.