MEASUREMENT AND PAYMENT

1. MOBILIZATION AND DEMOBILIZATION

Payment for mobilization and demobilization shall be made at the Contract lump sum price. The Contract lump sum price shall constitute full compensation for all costs associated with mobilizing to and demobilizing from the Project site, including transportation of equipment, materials, and personnel to and from the site, regardless of the number of trips required; all required permits, fees, and taxes; and all labor, materials, equipment, and incidentals necessary to complete the work.

2. 4-INCH PVC SDR 35 SOLID SEWER PIPE

Payment for 4-inch PVC SDR 35 Solid Sewer Pipe, as shown on the Design, shall be made at the Contract unit price per linear foot, based on the actual number of linear feet installed and accepted.
The Contract unit price shall constitute full compensation for all labor, materials, equipment, and incidentals necessary to complete the work, including excavation, backfill, and compaction; furnishing and installation of 4-inch solid PVC sewer pipe conforming to ASTM D3034, including all required fittings; connection to the existing sewer stub-out and septic tank; testing; restoration of all disturbed and trenched areas to a condition equal to or better than that existing prior to construction; and all other items necessary to provide a complete and operational installation

3. UNDERGROUND TWO-WAY CLEANOUT

Payment for each underground two-way cleanout, including double-sweep cleanouts, as shown on the Design, shall be made at the Contract unit price per cleanout, based on the actual number of cleanouts installed and accepted.
The Contract unit price shall constitute full compensation for all labor, materials, equipment, and incidentals necessary to complete the work, including excavation, backfill, and compaction; furnishing and installation of all required pipe, fittings, and cleanout components; and all other items necessary to provide a complete and operational installation.
No separate payment shall be made for cleanouts installed above grade as part of the connection to an existing residence.

4. 1,200-GALLON CONCRETE TRASH TANK

Payment for each 1,200-gallon concrete trash tank with watertight risers and lids, as shown on the Design, shall be made at the Contract unit price per tank, based on the actual number of tanks installed and accepted.
The Contract unit price shall constitute full compensation for all labor, materials, equipment, and incidentals necessary to complete the work, including excavation;