Med Press Pump Rebuild Performance Work Statement Redacted
Updated
A PDF document (261 KB) attached to Med. Press. Pump Module Motor Rebuild, from the Department of the Air Force. Due Nov 20, 2026, 12:00 PM (UTC-6).
File name: Med Press Pump Rebuild PWS_REDACTED.PDF
The full file is for paid members, or buy this bid alone.
Preview
CUI
Serv C27-007 Med. Press. Pump Module Motor Rebuild
04 August 2026
I
CUI
CUI
Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.
Section One
1.0 Description of Services
1.0.1 The contractor shall provide all labor, equipment, tools, materials, parts, and facilities necessary to restore five (5) 75-horsepower (HP) electric motors to a fully operational, Original Equipment Manufacturer (OEM) equivalent condition. These motors are assets supporting
the 1200 PSI medium-pressure calibration fluid test stands and must be capable of sustained operation in a high-stress testing environment.
1.2 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the one time repair; for the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix B (Off-Base),
1.2.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2.2 The contractor shall deliver the following outcomes for all five motors (Serial Numbers:
1MAF92910G005PW, 1MAF92910G002PW, 1MAN22856G001QX, 1MAF9190G001YU, and
01MAN22856G002QX):
•
•
•
•
Mechanical Integrity: All rotating apparatus, including Drive End (DE) and Opposite Drive End (ODE) shafts, shall meet original dimensional tolerances. Worn or damaged mechanical components shall be restored or replaced to eliminate excessive vibration and ensure proper alignment.
Electrical Integrity: Motor windings and electrical systems shall demonstrate full serviceability. Motors requiring full rewinds shall meet or exceed OEM specifications for insulation resistance, phase balance, and thermal endurance. Lubrication and Bearing Systems: Bearing systems shall be fully restored, correctly seated, and provisioned with appropriate high-stress lubricants to prevent premature failure under
The beginning of the document. Download the full file to read on.