Home / MN USPFO CRTC Annual Scrap Metal Recycling / Document

MN Sale Scrap Metal

Updated

A PDF document (188 KB) attached to MN USPFO CRTC Annual Scrap Metal Recycling, from the Department of the Army. Due Nov 13, 2026, 10:00 AM (UTC-6).

File name: MN USPFO-2027-001 Sale Scrap Metal.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Invitation for Bid
MNARNG Recyclable Scrap Metal

MN USPFO-2027-001

U.S. Government Scrap Metal Sale
Bidding Document Number:

MN USPFO-2027-001

Bids are due no later than:

10:00 AM CST on Friday, 13 November 2026

Inspection Dates/times:

Weekdays from 10-11 November 2026

10:00 AM – 2:00 PM CST

(Must e-mail to schedule an appointment; Ariel Gould at [email protected]
There are to be three locations on Camp Ripley where the contractor is to provide a single roll-off container (three total roll-off containers). The containers must have a minimum volume of 20 cubic yards and a maximum volume of 30 cubic yards. The current locations are as follows:

Property location:

Camp Ripley - Solid Waste Transfer Station
Camp Ripley - Ammunition Supply Point
Camp Ripley - United States Property and Fiscal Office – Warehouse
15000 Hwy 115, Camp Ripley
Little Falls, MN 56345
Direct Sales Officer:

Ariel Gould
[email protected]

Property to be sold:

The scrap metal consists of unseparated ferrous and non-ferrous materials. There are to be three roll-off container locations on Camp Ripley.
The scrap metal agreement in 2021 generated 231,280 pounds; the agreement in 2022 generated 140,500, the agreement in 2023 generated 160,276, the 2024 agreement generated 180,419; the 2025 agreement generated 243,619 and the 2026 agreement generated 460,638.

Period of Service:

The resulting sales agreement shall consist of a one (1) base year as follows:
Base year: 01 December 2026 – 30 November 2027

Property removal:

The contractor must pick up the roll-off container within 5 days of notification of the container being full and replace the container immediately with empty roll-off container.

Payment Terms:

Contractor agrees to make payment for the metal(s) based on the rate/percentage agreed upon for the market index at the time the scrap metal is removed from Camp Ripley. The container
switch/change-out fee shall be deducted from the payment amount. This deduction must be listed on the monthly transaction report. Payment should be made within the first 15 days of the following month. Any monies due to the government during each monthly period shall be address to and payable as shown below:
a. Payment sent to:
United States Property & Fiscal Office – Minnesota
Attn: Ariel Gould
15000 Hwy 115, Camp Ripley
Little Falls, MN 56345-4173
b. Check Payable to:
U.S. Treasury

Scrap Metal Bidding Document
(Offeror to provide bid in the space provided below and then return this sheet)

The beginning of the document. Download the full file to read on.