Overton Brooks VA Medical Center
Modernize 6N Inpatient Restrooms
Project Number #667-27-130
Section 00 01 10
SECTION NO
DIVISION AND SECTION TITLES
DATE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 32 16.15
01 33 23
01 35 26
01 42 19
01 45 00
01 45 35
01 74 19
01 81 13
General Requirements
Project Schedules (Small Projects – Design/Bid/Build
Shop Drawings, Product Data, and Samples
Safety Requirements for
Reference Standards
Quality Control
Special Inspections
Construction Waste Management
Sustainable Construction Requirements
11-21
12-25
03-26
05-24
11-20
02-21
06-21
04-22
10-17
DIVISION 02 – EXISTING CONDITIONS
02 41 00
Demolition
08-17
DIVISION 09 – FINISHES
09 91 00
Painting
01-21
DIVISION 10 – SPECIALTIES
10 21 23
Cubicle Curtain Tracks
01-21
DIVISION 12 – FURNISHINGS
12 32 00
12 36 00
Manufactured Wood Casework
Countertops
01-21
11-23
DIVISION 22 – PLUMBING
22 05 11
22 05 23
22 07 11
22 11 00
Common Work Results for Plumbing
General-Duty Valves for Plumbing Piping
Plumbing Insulation
Facility Water Distribution
01-23
09-20
09-19
03-26
667-27-130 Modernize 6N Inpatient Restrooms
VETERANS ADMINISTRATION, SHREVEPORT, LA
09-11-26
SECTION 01 00 00
GENERAL REQUIREMENTS
1.4
1.17
1.24
i
12-01-18
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall provide all labor, material, tools, equipment and supervision necessary to perform work in accordance with the project drawings and specifications and meeting all applicable code
requirements. All work shall be accomplished in a manner to minimize the impact of patient care and hospital operations.
Contractor shall
follow all station Infection Control Construction Risk Assessment
(ICRA) requirements, Construction Risk Assessment (CRA) requirements and Interim Life Safety Measure (ILSM) requirements.
ICRA, CRA and
ILSM shall post posted at the entrance of the construction area at all times.
B. Testing laboratory shall be retained by contractor. Prior to start of
work, provide Testing laboratory information for review and acceptance by the designated COR.
C. All employees of general contractor and subcontractors shall comply with VA security requirements.
All employees are required to wear a
Contractors ID at all times while on station.
the waist.
ID must be worn above
Superintendent is required to have 30-hour OSHA training.
All other employees and sub-contractors are required to have 10-hour
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- 6N Replace Toilets - 2 - Statement of Work - 667-27-130
- 6N Replace Toilets - 9 - Example PCU Cutsheet
- Current 6N Swivet Toilet locations
- Exhibit A Past Performance Relevancy
- Exhibit B Past and Present Performance Qestionnaire
- Exhibit C Subcontractor Information
- Exhibit D Safety Form
- Exhibit E Surety Form
- Exhibit F Request for Information