6N Replace Toilets - 2 - Statement of Work - 667-27-130
Updated
A PDF document (808 KB) attached to Modernize 6N Inpatient Restrooms (Swing for 3N), from the Department of Veterans Affairs. Due Nov 20, 2026, 2:00 PM (UTC-6).
File name: 6N Replace Toilets - 2 - SOW - 667-27-130_7-13-26.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
Modernize 6N Inpatient Restrooms
Project # 667-27-130
Overton Brooks VA Medical Center, Shreveport, LA
The Overton Brooks VAMC has a has a requirement to replace ten (10) inpatient restroom
“Patient Care Units” (PCU) comprised of a combination swivette toilet with sink and cabinet on the 6N ICU room (Fig.1) and replace them with a VA-approved fixed type toilet combo with sink and cabinet equal to or better than the existing PCUs located on 3N ICU room (Fig.2).
SCOPE OF WORK:
The contractor shall provide for all labor, equipment, and materials to perform the work outlined in this Scope of Work (SOW). The construction work shall provide access and continuous function/operation of adjacent occupied spaces (above, below and beside) shall consider any construction phasing to minimize the overall impact and disruptions generated by the construction activities. The nature of the work and location may require after hours and/or weekend work.
DEMOLITION:
Contractor shall protect all adjacent areas of the hospital, especially windows and doors during all operations. Repairing any damage shall be the sole responsibility of the contractor. If any damage is noticed prior to starting work which may be misconstrued as damage caused by the contractor, the COR shall be notified immediately, and the damage shall be documented as existing conditions.
NEW WORK:
New work includes, but is not limited to:
1. Demolition of 10 existing PCUs with Swivette toilets, cabinets, countertops, sinks, faucets, and hardware. See Fig (1) and (4).
2. Maintain and reuse existing water and plumbing connections for the new PCUs. 3. Prep, patch, and paint the areas of the walls where the existing PCUs were removed from. Paint color to match existing walls.
4. Provide for 10 new PCUs with fixed toilet, cabinet, countertop, sink, faucet, and hardware. See Figs. (2 & 3). Connect the water and sewer lines to the existing connections.
5. Provide new curtain track and curtains for privacy near new fixtures
PCU SALIENT CHARACTERISTICS:
1. Cabinet: A heavy duty stainless steel modular frame that includes kick plates, bedpan washer, dialysis box, plumbing access doors. The cabinet includes a pivoting padded toilet cover and back rest that doubles as a bedside seat. a. Color and Material type: TBD; To be finalized during the submittal phase.
2. Counter: The countertop comes with a 3” backsplash
a. Color and Material type: TBD; To be finalized during the submittal phase. 3. Toilet: Stainless Steel with wall mounted siphon jet type wit white plastic seat and self
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Modernize 6N Inpatient Restrooms - Combined Specifications
- 6N Replace Toilets - 9 - Example PCU Cutsheet
- Current 6N Swivet Toilet locations
- Exhibit A Past Performance Relevancy
- Exhibit B Past and Present Performance Qestionnaire
- Exhibit C Subcontractor Information
- Exhibit D Safety Form
- Exhibit E Surety Form
- Exhibit F Request for Information