MQR
Updated
A PDF document (145 KB) attached to C-130 Pison, Linear Actua, from the Defense Logistics Agency. Due Nov 16, 2026, 11:59 PM (UTC-7).
File name: MQR.pdf
The full file is for paid members, or buy this bid alone.
Preview
MANUFACTURING QUALIFICATION REQUIREMENTS
1650-00-404-6550
394018-7
LINEAR ACTUATING PISTON, DRAG STRUT, NLG
C-130
NSN:
P/N:
Noun:
Application:
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office ([email protected]) or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this LINEAR ACTUATING PISTON, DRAG STRUT, NLG. Offerors shall submit the Source Approval Request (SAR) package IAW AFMCI 23.113 and FAR 9.2 Qualification Requirements. b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government. c. Data Verification: The offeror must verify they possess the complete and most current data package for 394018 provided by the Government procuring office. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 417 SCMS/GUEA. The offeror shall also identify its sources for materials and its standards for internally used processes. e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 417 SCMS/GUEA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 394018. After completion of the
The beginning of the document. Download the full file to read on.