Home / USCG Mission System Integration Lab Packing, Rigging… / Document

MSIL Statement of Work Updated

Updated

A Word document (68 KB) attached to USCG Mission System Integration Lab Packing, Rigging, Transportation, Offloading, and Unpacking of Office, Computers, Electronic Equipment, Heavy Equipment, and Mission System Assets, from the US Coast Guard. Due Dec 4, 2026, 12:00 PM (UTC-5).

File name: MSIL SOW Updated.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK (SOW)

FOR
USCG Mission System Integration Lab Packing, Rigging, Transportation, Offloading, and Unpacking of Office, Computers, Electronic Equipment, Heavy Equipment, and Mission System Assets

RFI_FY270001

1.0 GENERAL

Background
The purpose of this Statement of Work is to obtain contractor support for the packing, rigging, loading, transportation, offloading, and unpacking of equipment, furnishings, and related assets from the USCG Mission System Integration Lab (MSIL) located in a secure facility at Naval Air Station Patuxent River located at 48192 Switzer Road, BLDG 2191, Room F-201, Patuxent River, MD 20670 and move it to another designated facility approximately 240 miles away at 112 Corporate Dr. in Elizabeth City North Carolina 27909.

The MSIL occupies approximately 2000 square feet of office and equipment space on the second floor of a secure facility located Naval Air Station Patuxent River, MD. The space contains multiple equipment racks populated with electronic equipment, radios, servers, flat screen televisions, large mock-ups, office furniture, and heavy equipment or large assets weighing up to 2,000 pounds. The Contracting Officer’s Representative (COR) requires professional relocation services to safely pack, protect, rig, remove, transport, offload, unpack, and place these items at a destination facility in North Carolina. Due to the location of the office space and the size and weight of certain items, the contractor must provide specialized equipment capable of reaching the second-floor access point and safely removing large and heavy equipment from the building. The Contracting Officer intends to award a Firm Fixed Price contract for this effort. Scope
The contractor must provide all labor, supervision, materials, tools, packing supplies, rigging equipment, lift equipment, vehicles, transportation, and incidentals necessary to complete the relocation. Provision and operation of special equipment necessary to reach the second-floor access point of the building. Access to the building for moving oversized items will be through a removable exterior wall section on the second floor, approximately 79 inches high by 46 inches wide. Certain large and heavy assets may require specialized hoisting equipment capable of operating on soft/uneven/unpaved ground able to access the second floor and remove the large/heavy items from the building. Work includes, but is not limited to:
Pre-move coordination, site assessment, and planning.

The beginning of the document. Download the full file to read on.