Home / MXS Crane Load Test / Document

MXS Crane Statement of Work Oct 26

Updated

A PDF document (686 KB) attached to MXS Crane Load Test, from the Department of the Air Force. Due Nov 19, 2026, 10:00 AM (UTC-8).

File name: MXS Crane SOW Oct 26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

AF
T

STATEMENT OF WORK

FOR

D

R

92 MXS Crane Load Test

November 2026

Statement of Work (SOW)
For

92 MXS Crane Load Test

Fairchild AFB, WA
1. BACKGROUND: The Mobile Crane that belongs to the 92d Maintenance Squadron requires a rated load test for the purposes of a Safety Investigation..
2. SCOPE OF WORK: The Contractor shall perform a full load test on the 92d Maintenance Squadron’s mobile crane, 11D00184.
3. OBJECTIVES: To have a Load Test performed on the MXS Crane for the purposes of s Safety Investigation. 4. REQUIREMENTS: Load test to be performed at 125% of the crane’s rated Capacity.

AF
T

5. GOVERNMENT FURNISHED EQUIPMENT AND SERVICES: The government shall furnish the Crane and provide a suitable location to perform the test.
6. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations. Personnel performing the work requested will be escorted for their duration on the installation. Individuals must be able to pass a background check that will be conducted prior to entry of the installation. Individuals performing the work will be required to provide their full name, DOB, SSN, driver’s license issuing state and license number to gain access to the installation.

7. PLACE OF PERFORMANCE:

R

8. PERIOD OF PERFORMANCE: Within 30 Days of contract award.

9. GENERAL INFORMATION:

D

9.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with 92 ARW Fight Safety, 509-247-3740.
January 1
3rd Monday in January
3rd Monday in February
Last Monday in May
June 19
July 4
1st Monday in September
2nd Monday in October
November 11
4th Thursday in November
December 25

10. APPENDICES:

New Year’s Day
Martin Luther King, Jr. Day
President’s Day
Memorial Day
Juneteenth
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas

The beginning of the document. Download the full file to read on.