Performance Work Statement
for
Halvorsen Aircraft Cargo Loaders Sustainment
Date QAPC signs QASP.

1.0 Description of Services

1.1 Objectives: This Performance Work Statement (PWS) describes the services required for the sustainment of the Halvorsen Aircraft Cargo Loader (ACL) of approximately 170 worldwide locations. These services include Overhaul, Field Support, Engineering Support, Program Management, and Data Management.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by sustaining a fleet of approximately 500 Halvorsens by providing overhaul, parts support, engineering support, and field support ensuring continuous support of worldwide cargo movement.
1.3 Background: The Halvorsen ACL is a key link in the USAF global mobility capability. There are approximately 500 Halvorsens at approximately 170 worldwide locations. The Halvorsen is a three (3) pallet position, 25,000lb loader that supports tactical cargo loading missions. Halvorsens are extensively used in support of Overseas Contingency Operations (OCO) and humanitarian relief missions.
2.0 Services Summary: The following table summarizes the performance thresholds for the most critical performance objectives of this effort.
Performance Objective

PWS
Reference

Performance Threshold

Quality of Contract Data
Requirements List
(CDRL) deliverable

4.2.1

Receipt of CDRL
deliverable

4.2.2

There shall be no more than one rejection of
any deliverable. There shall be no more than
three (3) total rejection(s) of deliverables
per contract year. The Government will reject
a deliverable if three (3) or more technical
errors or ten (10) or more minor errors are
found within the deliverable. The rejected
deliverable shall be corrected and resubmitted
within fifteen (15) business days of
notification of Government rejection.
There shall be no more than two (2) late
submissions of deliverables per contract
year. The Contractor shall notify the
Government at least five (5) working days
prior to due date if the delivery of any
data/document will not meet the scheduled
delivery date and negotiate a revised
delivery date. The data/document shall be
delivered by the revised delivery date
acceptable to the Government.

Delivery of Overhauled
Loaders

4.6.6

The Contractor shall complete early or on
schedule 100% of the overhaul deliveries in
accordance with the task order baseline