Notice of Intent to Sole Source v2 1
Updated
A Word document (26 KB) attached to Notice of Intent to Sole Source - Post-delivery support of developed?space and ground hardware and software, from the Department of the Air Force. Due Nov 4, 2026, 3:00 PM (UTC-7).
File name: Notice of Intent to Sole Source v2 1.docx
The full file is for paid members, or buy this bid alone.
Preview
NOTICE OF INTENT TO SOLE SOURCE
General Information
Notice Type: Special Notice
Contracting Office: Space RCO
Title: Notice of Intent to Sole Source - Post-delivery support of developed space and ground hardware and software. Response Date: No later than 1500 MST on 04 NOV 2026
NAICS Code: 541715
Product Service Code (PSC): DA10
Description:The Space Rapid Capabilities Office (Space RCO) intends to solicit and negotiate a contract on a sole-source basis with Systems & Technology Research, LLC, Woburn, Massachusetts under the statutory authority of 10 U.S.C. 3204(a)(1) as implemented by RFO 6.103-1, Only one responsible source and no other supplies or services will satisfy agency requirements. Requirement Description:Space RCO requires post-delivery support of developed space and ground hardware and software. This effort will continue to provide systems engineering support for verification and validation of interface requirements, hardware integration and test, and on-orbit troubleshooting as the payloads are integrated onto host vehicles, tested, launched, and perform on-orbit. The instant action is to procure services to transition a prototype ground system to a full operational capability. The requirements outline a need for software development and integration expertise to enhance the existing system with a new graphical user interface (GUI), integrate mission-unique software (MUS), improve telemetry processing and data handling, and ensure the system can support long-term, 24/7 operations. The effort also requires integration with the R2C2 Acme Ground Segment, maintaining external connections, development on cloud infrastructure, and adherence to cybersecurity and systems engineering best practices. Full operational capability should be obtained within 6 months from ATP. Projected Base and Option Year CLIN Structure:
CLIN 0001 (CPFF) - 2-Year Base, 3 (three) 1-Year Options. CLINs 0003, 0004 (Cost Only, No Fee) - 2-Year Base, 3 (three) 1-Year Options. CLIN 0002 (T&M) - 1-Year Base, 4 (four) 1-Year Options.
Reason for Sole Source:
Systems & Technology Research, LLC is the original developer of the prototype ground system. The contractor holds specialized technical expertise and existing infrastructure knowledge required to transition this system to Full Operational Capability (FOC). No other source possesses the requisite technical familiarity to meet the aggressive 6-month FOC requirement without causing unacceptable delays in fulfilling the agency's critical requirements and generating substantial duplication of costs that is not expected to be recovered through competition.
The beginning of the document. Download the full file to read on.