BRIDGE INSPECTION REPORT

TURNTABLE BRIDGE

TURNTABLE BRIDGE OVER TURNTABLE PIT

STEAMTOWN NATIONAL HISTORIC SITE

LOOKING TOWARD B

STRUCTURE NO. 4810-033P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 11/18/2025

Report prepared by:
Federal Highway Administration

RIGHT SIDE

FLH Office of Bridges and Structures
Bridge Inspection Program
22001 Loudoun County Parkway, Building E2, Suite 200
Ashburn, VA 20147
https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY

TURNTABLE BRIDGE

STRUCTURE NO.
INSPECTION DATE.

4810-033P
11/18/2025

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

MAIN SPAN TYPE:

# OF BEAMS, MAIN SPAN:

DECK TYPE:

WEARING SURFACE:

ABUT. FOUNDATIONS:

PIER FOUNDATION(S):

ABUTMENT / PIER MAT'L:

PROJ./PLAN REF. NO:

NPS ROAD CLASS:

STRUCTURE HISTORY:

3 - STEEL

03 - GIRDER AND FLOORBEAM

SYSTEM

9 - OTHER

9 - OTHER

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE

/

1 - PRINCIPAL PARK ROAD

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH:

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED:

SKEW ANGLE:

FRACTURE CRITICAL:

90.5
10.0
10.0
1990

FT ( 27.6 M)
FT ( 12.8 M)
FT (

3 M)

FT (

3 M)

Y

°

LOCATION

STEAMTOWN NATIONAL HISTORIC SITE

MILE POINT:

(KM PT 0

)

STATE:

423 - PENNSYLVANIA

LOCATION: Center of Roundhouse

FACILITY CARRIED:

TURNTABLE BRIDGE

FEATURE INTERSECTED:

TURNTABLE PIT

Parviz Sharifi

INSPECTION TEAM:

TEAM LEADER

Parviz Sharifi

REPORT REVIEWER

Marcus Miller

REPORT APPROVER

02/17/2026
Jorgomai Ceesay

STRUCTURE EVALUATION SUMMARY

This steel girder railroad turntable is in good condition overall. The only problems requiring attention at this time include accumulation of debris on the bottom flanges at the wheel bearing areas, debris inside the center pivot, and spot rusting of the steel girders, mainly at the bearing areas and diaphragms. In addition, the retaining wall exhibits some signs of deterioration, including staining and cracking with efflorescence at several locations. This condition will continue to be monitored during future inspection cycles. Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future.

RECOMMENDATIONS AND ESTIMATED COSTS

STRUCTURE NO.

4810-033P

TURNTABLE BRIDGE

INSPECTION DATE :

11/18/2025

D

PRIORITY OF IMPROVEMENT

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger. B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.