OFFEROR QUESTIONS AND RESPONSES
AM202603-25 Rev. 1
Question:
Would LBNL accept a closed loop liquid-cooled SSPA?
Comments:
- The cooling unit would be in the same 6’ rack as the transmitter - liquid cooled solution would include a heat exchanger (either liquid to air or liquid to liquid (if there is access to a cooling room or water tower)) - solution would include pulse correction
- solution would include droop correction
- solution would be hot swappable/fast field replaceable - solution would have graceful degradation
- solution would have embedded power supply
Response:
Yes, please submit a bid for the closed-loop liquid-cooled SSPA. We can review the proposed solution and determine how to best accommodate the heat exchanger as an interface with the closed-loop cooling system.
If supplier can offer an off-the-shelf system that meets LBNL’s requirements, it will receive high consideration.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- LBNL Electrical Equipment Build Standard V6
- LBNL Facilities Master Specifications.11 600 Volt Conductors and Cable
- LBNL Facilities Master Specifications Low-Voltage Electrical Power Conductors and Cables
- LBNL ES H Manual Chapter 43 Non Ionizing Radiation
- LBNL PUB 3111 Quality Assurance Program Description
- Appendix A Electrical Equipment Hazard Labeling
- Appendix B Electrical Equipment Fabrication
- Appendix C Ground Hook Safety
- Appendix D Rack Build Standard
- LBNL Electrical Safety Manual Revision 1
- LBNL RPM on Safe Electrical Installations Policy
- LBNL ES H Manual Chapter 08 Electrical Safety Program