SUBMITTED TO:
Atkins North America, Inc.
7604 Technology Way, Ste.
Denver, Colorado 80237
BY:
Shannon & Wilson
5900 W 38th Ave
Wheat Ridge, CO 80212
(303) 825-3800
www.shannonwilson.com
PAVEMENT DESIGN REPORT
HI FLAP CR 562(1)
Kilauea Point National Wildlife
Refuge
KAUA'I COUNTY, HAWAII
September 2023
Shannon & Wilson No: 107654-001
HI FLAP CR 562(1)
Kilauea Point National Wildlife Refuge
Pavement Design Report
3.1
3.2
4.1
4.2
4.3
4.4
6.1
6.2
6.3
6.4
6.5
7.1
7.2
7.3
107654-001
7.2.1
7.2.2
7.2.3
7.2.4
7.2.5
ii
September 2023
HI FLAP CR 562(1)
Kilauea Point National Wildlife Refuge
Pavement Design Report
Exhibits
Figures
Figure 1:
Vicinity Map
Figure 2:
Site and Exploration Plan
Appendices
Appendix A: Subsurface Explorations
Appendix B: Laboratory Test Results
Appendix C: Photographs
Appendix D: Pavement Design Calculations
107654-001
Important Information
iii
September 2023
HI FLAP CR 562(1)
Kilauea Point National Wildlife Refuge
Pavement Design Report
INTRODUCTION
This report summarizes the results of our subsurface exploration and laboratory testing program and presents pavement design recommendations and construction considerations for the proposed improvements to Kilauea Road, Kolo Road, and Kilauea Point Overlook as part of the Central Federal Lands Highway Division (CFLHD) project HI FLAP CR 562(1) Kilauea Point National Wildlife Refuge (the Project) located in Kaua'i County, Hawaii. Our scope of services was specified in Task Order 2, Subcontractor Number 1009739 with Atkins North America, Inc. (Atkins) dated August 15, 2021. Our conclusions and recommendations in this report are based on:
The limitations of our approved scope, schedule, and budget described in our contract;
Our understanding of the Project and information provided by Atkins;
Subsurface conditions observed in the borings at the time our explorations were completed; and
The results of testing performed on samples collected from the explorations.
The objective of our geotechnical studies was to provide recommendations and construction considerations, as presented herein, for the proposed roadway reconstruction. The authorized scope of services was based on this objective, and this report should not be used for other purposes without Shannon & Wilson’s review. If a service is not specifically indicated in this report, do not assume that it was performed.
SITE AND PROJECT DESCRIPTION
The site is located along Kilauea Road extending from the town of Kilauea to the Kilauea Point Overlook (refer to Figures 1 and 2). The Project is approximately 1.72 miles in length