852.236-72 Performance of Work by the Contractor.
As prescribed in 836.101-770, insert the following clause:
Performance of Work by the Contractor (OCT 2026)(DEVIATION)
(a) The Contractor must submit, simultaneously with the schedule required by the specifications of the contract, a statement designating the portions of contract work to be performed with the Contractor’s own forces. The approved schedule must be used in determining the value of a work activity/event, or portions thereof, of the work for the purpose of this article.
(b) Changes to established activity/event identifiers or responsibility codes for Contractor activities must not be made without approval from the Contracting Officer.
(End of clause)
Alternate I (OCT 2026)(DEVIATION)
For requirements which include a Network Analysis Schedule, substitute the following paragraph (a) for paragraph (a) of the basic clause above:
(a) The Contractor must submit, simultaneously with the cost per activity of the construction schedule required by the specifications of the contract, a responsibility code for all activities of the network for which the Contractor’s forces must perform the work. The cost of these activities must be used in determining the portions of the total contract work to be executed by the Contractor’s forces for the purpose of this article.