PERFORMANCE WORK STATEMENT
PEARL HARBOR NAVAL SHIPYARD & INTERMEDIATE MAINTENANCE FACILITY
(PHNSY & IMF) NON-HAZARDOUS POLYETHLYNE AND RUBBER REMOVAL
PERFORMANCE WORK STATEMENT
1.0 Background
1.1 Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) is a naval industrial facility that generates various non-hazardous wastes in the process of altering, repairing and maintaining the U.S. Navy’s vessels and facility buildings/structures. Although these wastes generated are not regulated by the Environmental Protection Agency (EPA) as hazardous waste, they do require proper management (i.e., processing, handling and disposal) to ensure that PHNSY & IMF is in compliance with all federal, state and local environmental rules and regulations.
2.0 Objective/Scope of Work
2.1 PHNSY & IMF seeks to establish a one-year contract to dispose of rubber products on a regular basis to a licensed and authorized landfill facility on the Island of Oahu, State of Hawaii. The non-hazardous wastes consist of the following categories:
2.1.1
NON-HAZARDOUS WASTES SUMMARY TABLE A
Waste Description
Max Load/Year
Total Tons/Year
Rubber and Polyethylene Products (e.g.,
Hoses, Mats, Sheets)
Type of Method of Containment: Loose material in dump trailer(s). Estimated net weight per load is 6 tons.
Note: The Load/Year and tons/Year are projected estimates based on past history and projected work load.
Note: The Contractor shall accept the rubber waste 'as-is,' which explicitly includes uncut, heavyduty industrial hoses, including those containing internal wire braiding, wire reinforcement, or embedded steel cores, as well as hoses with external metal tips, couplings, sleeves, or flanges intact. If the Contractor's designated disposal facility prohibits internal wiring, metal tips, or requires hoses to be cut, shredded, or separated prior to disposal, all such pre-processing, metal extraction, and disposal of residual components shall be the sole responsibility and cost of the Contractor under their Firm-Fixed-Price (FFP) obligation.
3.0 Performance Requirements
3.1 Business Hours: Contractor shall accept deliveries of waste during normal weekday business hours Monday-Friday (0600-1430) except for federal holidays.
3.2 Location: PHNSY&IMF
3.3 Quantities: The Contractor shall pick up and drop off up to 40 loads, with an average weight of 6 tons per load not to exceed a total of 250 tons of non-hazardous rubber waste to an authorized disposal facility.