Performance Work Statement
Updated
A Word document (71 KB) attached to Repair of NSN: 3010016608071FD Gearcase Motor, JTE System, from the Department of the Air Force. Due Dec 17, 2026, 12:00 PM (UTC-7).
File name: Performance Work Statement (PWS).docx
The full file is for paid members, or buy this bid alone.
Preview
DEPARTMENT OF THE AIR FORCE
OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820
PERFORMANCE WORK SPECIFICATION (PWS)
PR NO: FD20202700097
DATE: 3 November 2026
SCOPE OF WORK: For the end item, the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition. Services to be performed will not be essential in a crisis situation. Work consists of one of two efforts: Test, teardown, and evaluation (TT&E) only or TT&E and repair.
TEST, TEARDOWN, AND EVALUATION: The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) and, if necessary, approval to repair will be negotiated. If no further repair is required, the asset must be returned in serviceable condition and meet section 6.0 cosmetic requirements.
REPAIR: (NTE) The contractor shall perform the repair or replacement of all failed parts and components. Each end item must be cleaned, configured, refinished, and tested to meet the original specifications of the end item. The end item shall be returned in serviceable condition and meet section 6.0 cosmetic requirements.
Below listed item(s) will be shipped to contractor to repair:
Item Description
NSN
Part Number
GEARCASE-MOTOR
3010-01-660-8071
133610-5
This PWS establishes the minimum work requirements to return the end item(s) to a serviceable condition and meet section 6.0 cosmetic requirements.
ESD(Electrostatic Discharge - See section 5.4): NO
WORK PERFORMANCE REQUIREMENTS:
TECHNICAL OR PERFORMANCE REQUIREMENTS: Unit will meet all performance requirements of a new item. All repaired/retrofitted items will be configured and perform IAW the latest requirements of the Specification Control Drawing and Acceptance Test Plan listed in the Repair Data List (RDL).
OBSOLETE COMPONENTS: If obsolete components are identified, the contractor shall notify the 415 SCMS and the PCO in writing and prepare an Engineering Change Proposal (ECP) IAW CDRL D001.
The beginning of the document. Download the full file to read on.