Home / PCDMIS CAD++ Software Renewal and CMM Calibration / Document

Performance Work Statement

Updated

A PDF document (494 KB) attached to PCDMIS CAD++ Software Renewal and CMM Calibration, from the Department of the Air Force. Due Nov 25, 2026, 10:00 AM (UTC-5).

File name: Performance Work Statement.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT (PWS)

PCDMIS CAD++ Software Renewal and CMM Calibration

11 June 2026

1.0
DESCRIPTION OF SERVICES. The Contractor shall provide four (4) each PCDMIS CAD ++ DCC, Autopath and one (1) PCDMIS CAD++ Scanning/Mesh software subscription renewals. The Contractor shall also provide all labor, parts, materials, tools, equipment and travel necessary to certify and calibrate four (4) Global Coordinate Measuring Machines (CMM) and one (1) Absolute Arm located within the Physical Science Laboratory in Building 323 in support of the 402 Maintenance Support Group (MXSG) at Robins Air Force Base, Georgia. 1.1 Services included for the following items:
Description

Qty.

Serial #

Part #

PCDMIS CAD++

Autopath

PCDMIS CAD++

Scanning/Mesh
Global CMM
Global CMM
Global CMM
Global CMM
Absolute Arm

-

-

-

-

0320-6206
0320-6505
0320-6506
1221-6911
8725-7-15116

9.15.8
12.22.10
12.22.10
15.40.10
RA8 V3

1.2 Preventative Maintenance and Calibration. The Contractor shall perform one preventive maintenance (PM) and calibration service on the items listed under Table 1 every year to factory specifications as required by manufacturer's official publications (such as service manuals and standard service contract stipulations) to assure long-term performance and reliability of the instrument and to verify system performance. All service work will be performed by Original Equipment Manufacturer (OEM) certified factory-trained personnel employed by the contractor. Service technicians will perform services using the most up-to-date maintenance techniques, instrument operation and modifications, and latest state-of-the-art applications for service/repair being performed on this equipment according to OEM specifications. The contractor shall contact designated Government Contract Point of Contact (POC) listed in 4.1 to schedule date/time to complete preventive maintenance/calibration services. All PM, calibration, covered parts, software/hardware maintenance, and technical support shall be serviced in accordance with the MyCare Premium Plan (attachment 1).

1.2.1 Table 1

Model

Global Performance
Global Performance
Global Performance
Global CMM
Absolute Arm

Size

Serial #

9.15.8
12.22.10
12.22.10
1221-6911
8725-7-15116

0320-6206
0320-6505
0320-6506
15.40.10
RA8 V3

1.3 Calibration Services Certifications. The Contractor shall electronically provide a Calibration Certificate as a PDF IAW Technical Order 00-20-14 to the Government POC

The beginning of the document. Download the full file to read on.

Other documents in this bid