Home / Arc Spark Optical Emission Spectrometer LAV-MIL / Document

Performance Work Statement

Updated

A PDF document (326 KB) attached to Arc Spark Optical Emission Spectrometer LAV-MIL, from the Department of the Air Force. Due Nov 12, 2026, 1:00 PM (UTC-6).

File name: Performance Work Statement.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

CUI

PERFORMANCE WORK STATEMENT

FOR

76 MXSG ARC SPARK OPTICAL EMISSIONS SPECTROMETER

PREPARED BY:

OC-ALC/OBCA

5 October 2026

I
CUI

CUI

Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precautions to prevent accidents and preserve the health/safety of each contractor and government employee.
Section One
1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the Preventive Maintenance service, PM Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix A
1.1.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Requested Services: Requested Services: The Contractor shall provide annual Preventive Maintenance (PM) services for the Arc Spark Optical Emissions Spectrometer, with four (4) option years.
1.3 Preventive Maintenance (PM): The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform 2 PM’s per year on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Government Point of Contact (GPOC) within ten (10) business days after contract award. The Contractor shall notify the GPOC seven (7) business days prior to each scheduled PM visit. 1.4 Over and Above (O&A): O&A is defined as work discovered during the course of performing the repair efforts that are within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028. PGI 217.77. 1.5 Malfunction and Notification Process: Upon the occurrence of an equipment or system

The beginning of the document. Download the full file to read on.