Performance Work Statement
for
APY-1/2 5-Volt Power Supply Repair
Purchase Request: FD2060-25-00897
4 Aug 2025
PR: FD2060-25-00897 PWS REVISION: 0
1.0 Description of Services
1.1 Objective(s): This Performance-Based Work Statement (PWS) describes the services required to repair the AN/APY-1/2 5-Volt Power Supply avionics component. These services require the Contractor to accomplish repair of designated National Stock Number (NSN) observing accepted quality standards and relevant technical standards. The Contractor shall also track and resolve items affected by Product Quality Deficiency Reports (PQDR) and promptly provide serviceable assets within the established Turn Around Time (TAT). The Contractor shall also provide timely and accurate reporting in Commercial Asset Visibility Air Force (CAVAF) system.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by maintaining the APY-1/2 to provide a continued flow of serviceable assets to the warfighter thus increasing the mission capable rate and reliability of the weapon system. The continued operational availability and reliability of the APY-1/2 is critical to support the current mission requirement of the E-3 Airborne Warning and Control System (AWACS) aircraft. This effort will ensure availability levels are maintained. Continued repair and availability of this system is critical.
1.3 Background: This PWS tasks the Contractor to provide depot repair of specified APY-1/2 Radar system hardware, NSN 6130014513046CW and part number PS12295.
2.0 Services Summary
Performance Objective
Quality of repair
PWS
Reference
4.4
Delivery of repair
4.5
CAV-AF reporting
4.3.3
Performance Threshold
There shall be no more than 1 PQDR for this
Contract.
The Turnaround Time (TAT) is 45 calendar days for
repair at a rate not required to exceed 3 per month.
There shall be no more than one late delivery for this
contract. The Contractor shall notify the Government
if the delivery of any asset will not meet the
scheduled delivery date and negotiate a revised
delivery date. The late asset shall be delivered by a
revised delivery date acceptable to the Government.
The Contractor shall report production in CAV-AF.
The Contractor shall provide data on the actions
conducted for each unit. The Contractor shall report
as actions occur.
3.0 Government Property
PR: FD2060-25-00897 PWS REVISION: 0
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in