Performance Work Statement Attachment III - Electric Elevator Test
Updated
A Word document (81 KB) attached to Elevator Repair and Maintenance Support Services, from the Department of the Army. Due Nov 30, 2026, 12:00 PM (UTC-5).
File name: B08 - PWS Attachment III - Electric Elevator Test.docx
The full file is for paid members, or buy this bid alone.
Preview
5648325476250002349500
Fort Huachuca, Directorate of Public Works
Periodic tests of Electric Elevators
Quality Assurance Check List
Test Performed: Bi-Annual ☐ Annual ☐ Five (5) Year ☐
Test Performed: Bi-Annual ☐ Annual ☐ Five (5) Year ☐
Building & Unit Information
Building Name
Owner/Building Management Name
Building Address
Unit Identification / Unit PIN
BI-ANNUAL INSPECTIONS
ASME Section
Pass
Fail
N/A
Static and relief pressure test
1005.1
Safety test
1002.1
ANNUAL INSPECTIONS
ASME Section
Pass
Fail
N/A
Oil Buffers
8.11.2.2.1
Safeties
8.11.2.2.2
Governors
8.11.2.2.3
Slack-Rope Devices on Winding Drum Machines
8.11.2.2.4
Normal and Final Terminal Stopping Devices
8.11.2.2.5
Firefighters’ emergency Operation
8.11.2.2.6
Standby or emergency Power Operation
8.11.2.2.7
Power Operation of Door System
8.11.2.2.8
Broken Rope, Tape, or Chain Switch
8.11.2.2.9
E/E/PES Electrical Protective Devices
8.11.2.2.10
FIVE (5) YEAR INSPECTION
ASME Section
Pass
Fail
N/A
Car and Counterweight Safeties
8.11.2.3.1
Governors
8.11.2.3.2
Oil Buffers
8.11.2.3.3
Braking System
8.11.2.3.4
Emergency and Standby Power Operation
8.11.2.3.5
Emergency Terminal Stopping and Speed Limiting Devices
8.11.2.3.6
Power Opening of Doors
8.11.2.3.7
Leveling Zone and Leveling Speed
8.11.2.3.8
Inner Landing Zone
8.11.2.3.9
Emergency Stopping Distance
8.11.2.3.10
The Above Tests Were Performed In Compliance With ASME A17.1 Firm Performing Test/Service
Elevator Contractor Number
Firm Address
Firm City/State/Zip
Name of Mechanic Performing Test/Service
Date of Test/Service
The beginning of the document. Download the full file to read on.