Home / Angkor Sentinel 27 Base Life Support Facility Rehab Services / Document

Performance Work Statement Cambodia Angkor Sentinel BLS Facility Rehab Services

Updated

A Word document (76 KB) attached to Angkor Sentinel 27 Base Life Support Facility Rehab Services, from the Department of the Army. Due Nov 20, 2026, 1:00 PM (UTC-10).

File name: Performance Work Statement__Cambodia Angkor Sentinel BLS_Facility Rehab Services.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT (PWS)

Angkor Sentinel 27 (AS27) Base Life Support and Facility Rehabilitation Services

Part 1
General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: The Contractor shall provide Base Life Support (BLS) and facility-rehabilitation services in support of Angkor Sentinel 27 (AS27) in Cambodia. The Contractor shall provide all management, personnel, materials, equipment, tools, supervision, transportation incidental to performance, permits, licenses, and other resources necessary to complete the requirements identified in this PWS, except for items expressly identified as Government-furnished.

Services include rehabilitation and repair of designated dining, classroom, pavilion, and medical-classroom facilities; electrical infrastructure support; backup power; solid-waste collection and disposal; black-water and grey-water services; and provision and support of handwash and chemical-latrine facilities.

1.2 Background: The Government requires facility repairs, utility support, sanitation services, and waste-management services necessary to support AS27 operations at the designated training location (Multinational Peacekeeping Force Training Center (ភូមិផ្គង់, ផ្លូវលេខ ៤៤, គីឡូម៉ែត្រ ៨, Krong Chbar Mon, Cambodia; PKO). The requirements are intended to ensure safe, functional, sanitary, and reliable BLS conditions for personnel using dining, classroom, billeting, and associated support areas.

1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall furnish all personnel, equipment, supplies, facilities, tools, materials, supervision, permits, licenses, and incidental services necessary to perform the BLS and facility-rehabilitation requirements in this PWS.

1.4 Objectives: The Contractor shall complete the following objectives:

Rehabilitate and repair designated DFAC Dinning Area, classroom, pavilion, and medical-classroom facilities.

Repair, replace, upgrade, and support electrical infrastructure necessary for dining, and classroom operations.

Provide backup generator capability and fuel support.

Provide waste, black-water, and grey-water collection and disposal.

Provide handwash and chemical-latrine facilities, including connection to usable septic capability or an approved alternative solution.

The beginning of the document. Download the full file to read on.

Other documents in this bid