Pumping and Cleaning Grease Traps, Septic Tanks & Lift Stations.

Contract Management Branch
Service Contracts Section

PERFORMANCE WORK STATEMENT

(PWS)

Fort Bragg, North Carolina.

2 September 2026

Revision: 3

Part 1: General Information

1.1. Description of Services/Introduction

1.2. Background

1.3. Objectives

1.4. Scope

1.5. Traffic Flow

1.6. Restoration of Real Property Damage

1.7. General Information

1.8. Period of Performance

1.8.1. Place of Performance

1.8.2. Recognized Holidays

1.8.3. Hours of Operation

1.8.4. Installation Closures

1.8.5. Inclement Weather

1.9. Emergency Delays

1.10. Fraud, Waste, and Abuse

1.11. Type of Contract

1.12. Security

1.12.1. Security Requirements

1.12.2. Security Program

1.12.3. AT Level I Training

1.12.4. Access and General Protection/Security Policy and Procedures

1.12.5. iWATCH Training

1.12.6 Contractor employees who require access to government information systems 1.12.7. Contracts that require an OPSEC standing operating procedure/plan

1.12.8. Contracts that require Opsec training

1.12.9. Information Assurance (IA) Information Technology Training 1.12.10 Information Assurance (IA) Information Technology Certification 1.12.11. Contracts that require handing classified information

1.12.12. Secured Areas / Restricted Areas

1.12.13. Eligibility Verification for employment

1.12.14. 3Rs (Recognize, Retreat, Report) Explosives Safety Education Program Training. 1.12.15. Physical Security Plan.

1.13. Security Training

1.13.1. Training

1.13.2. Anti-Terrorism (AT) Level I Training

1.13.3. iWATCH Training

1.13.4 Counterintelligence Awareness and Reporting Program Training

1.14. Local Health Protection Conditions

1.14.1. Key Control

1.15. General

1.15.1. Personnel Certifications

1.15.2. Access and General Protection/Security Policy and Procedures

1.16. Post Award Conference/Periodic Progress Meetings

1.17. Government Roles and Responsibilities

1.17.1. Contracting Officer (KO)

1.17.2. Contracting Officer’s Representative (COR/ACOR)

1.17.3. COR/ACOR Authority

1.17.4. COR or Designated Government Representative Functions 1.18. Specific Contractor Requirements, Roles, and Responsibilities

1.18.1. U.S. Residency

1.18.2. Contractor Hiring Restrictions

1.18.3. Contractor Identification

1.18.4. Standards of Conduct

1.18.5. Contractor Key Personnel

1.18.6. Project Manager (PM)

1.18.7. Quality Control Manager/Inspector (QCM)

1.18.8. Quality Control Program (QCP)

1.18.9. Other Qualifications

1.19. Phase In /Phase Out Period

1.20. Emergency Services

1.20.1. Emergency Medical Treatment

1.20.2. Accident Reporting