Performance Work Statement DATED Redacted
Updated
A Word document (902 KB) attached to SIPR LAN Drops, from the Department of the Air Force. Due Nov 4, 2026, 11:00 AM (UTC-6).
File name: PWS DATED 18 SEP 26_Redacted.pdf.docx
The full file is for paid members, or buy this bid alone.
Preview
Performance Work Statement (PWS)
18 September 2026
1383284152291
Requirement / Description of Services:
67310044510467038644510is requesting to have 8 fiber SIPR drops installed in
Communications Deliverables:
Contractor/installer shall provide for review final ISP/OSP copper to fiber test report(s) and as-built/as-installed drawings prior to scheduling a final quality assurance inspection. Deliverables guidance can be found in the nfrastructure Standards and Installation Specifications (Design Guide).
General Requirements:
The contractor shall provide all material and perform all work in strict adherence to the attached PWS, and applicable standards. Contractor is required to include in their response to the request for quote, a list of the products they plan to provide, along with corresponding parts numbers and quantities for technical approval. Contractor shall be required to engineer, furnish, test, and install as necessary to provide a complete system, from end to end. All DoD and Industry standards/guidelines shall be used to provide a complete system, from end to end. Since standards are continually being revised, contractors and installers shall refer to the latest version of any relevant standard for compliance. All new work area outlets shall have a j-hook placed either above the ceiling or within proximity to and a minimum of 12-inches of slack provided on the j-hook. Contractor shall provide fiber cable slack within the cable tray for maintenance of the horizontal cabling system configuration as follows in Telecommunications room cable ladder- UTP/ScTP 10-feet / SM/MM 10-feet, work area outlet – UTP/ScTP 1-foot/ SM/MM 3.5 feet above the ceiling. Do not put slack or service loops in communications cabinets or racks.
Telecommunications Room T-115 Grounding and Bonding:
Contractor shall ensure telecommunications copper Primary Busbar (PBB) and conductors suitable for indoor installation in accordance with ANSI/TIA-607.
Busbar(s) and conductor(s) must be made of copper or copper alloys having a minimum of 95% conductivity. Install ground conductor of appropriate sizing (#6 AWG up to #750 MCM) from the telecommunications room busbar location to the main building or servicing floor electrical panel in EMT conduit. Conduit shall be identified, tagged, or labeled from point-to-point as Telecommunications Bonding Conductor (TBC). Connections of the TBC and the Telecommunications Bonding Backbone (TBB) shall utilize UL listed compression two-hole lugs or two-hole irreversible crimp connectors.
The beginning of the document. Download the full file to read on.