Performance Work Statement DWA Skeleton Bay Draft Tube Bulkhead Rehabilitation
Updated
A PDF document (338 KB) attached to Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation, from the Department of the Army. Due Oct 30, 2026, 1:00 PM (UTC-8).
File name: 27QA002_PWS_DWA Skeleton Bay Draft Tube Bulkhead Rehabilitation.pdf
The full file is for paid members, or buy this bid alone.
Preview
DWORSHAK SKELETON BAY DRAFT TUBE BULKHEAD REHABILITATION
W912EF27QA002
BID ITEM LIST
ITEM
0001
DESCRIPTION
Items
Unit 4 Draft Tube Bulkhead Rehabilitation
Contractor can pick up after November 23, 2026,
and return by January 23, 2027
QUANTITY
U/M*
U/P*
AMOUNT
EA
0002
Unit 5 Draft Tube Bulkhead Rehabilitation
Contractor can pick up after February 22. 2027 and
return by April 19, 2027
EA
0003
Unit 6 Draft Tube Bulkhead Rehabilitation
Contractor can pick up after May 10, 2027 and
return by July 5, 2027
EA
0004
Supplied Materials – Paint kits
Deliver with Unit 4 Draft Tube Bulkheads by
January 23, 2027
EA
0005
Weld Repair
NTE* 40
LF
U/M* = Unit of Measure
U/P* = Unit Price
NTE* = Not To Exceed
Est* = Estimated
DWORSHAK SKELETON BAY DRAFT TUBE BULKHEAD REHABILITATION
W912EF27QA002
TECHNICAL SPECIFICATIONS
1.0 SCOPE
The following specification pertains to the transportation, inspection, and rehabilitation of twelve (12) draft tube bulkheads and associated seal keeper bars. The rehabilitation includes existing coating removal, weld repairs, and new coating application in accordance with the specifications below. The Contractor shall perform all duties assigned in the specification below for all bulkheads.
2.0 GENERAL REQUIREMENTS
2.1 The Scope of work for this project shall not be modified without prior approval from the contracting officer. The Contractor shall not deviate from the specifications listed herein without prior approval from the contracting officer.
2.2 All work conducted in accordance with this contract shall be comply with Federal, State, and local regulations.
2.3 The Government (GOVT) reserves the right to travel to Contractor’s facility for quality assurance inspections at any point during the progression of this contract.
3.0 DRAFT TUBE BULKHEAD TRANSPORTATION
The critical defining elements for the transportation of the draft tube bulkheads (bulkheads) are as defined below: 3.1 The Contractor shall be responsible for transportation from Dworshak Dam to the repair facility and back to Dworshak Dam from the repair facility for the bulkheads. The Contractor shall transport the bulkheads in a manner that does not damage the integrity of any structural members or the newly applied coating upon return.
3.2 GOVT personnel will handle the bulkheads to the contractors desired orientation (from two options below) and will use the bridge crane to load and unload the bulkheads at Dworshak Dam onto and off the contractors’ truck. The bulkheads can be oriented in a manner that they are in the (option 1) flat, horizontal