Performance Work Statement
Updated
A Word document (68 KB) attached to RRAM Support Services, from the Department of the Navy. Due Nov 5, 2026, 10:00 AM (UTC-5).
File name: 1.05 - Performance Work Statement.docx
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE WORK STATEMENT
BACKGROUND AND OBJECTIVES
This requirement is for Physical Distribution support services as required by the NAVSUP FLCN, Logistics Division. The services will support the Fleet Logistics Norfolk (FLCN) - Logistics Division by providing Physical Distribution to various commands, provide warehouse support services for the Mid-Atlantic Regional Maintenance Center (MARMC) Shipping/Receiving Center and Integrated Logistics Overhaul (ILO) Maintenance Support Assistance Team (MSAT) support.
SCOPE
The FLCN Logistics Department has an ongoing requirement for contractor logistical support services, warehousing, kitting, inventory control and physical material distribution expertise. The contractor shall accomplish FLCN objectives in support of the Real-time Reutilization Asset Management (RRAM), support services to operate the MARMC Shipping/Receiving Center and ILO MSAT support.
TECHNICAL REQUIREMENTS
The Contractor is solely responsible for the technique used to fulfill the terms of this Performance Work Statement (PWS). Further, the Contractor remains solely responsible for control and supervision of contractor personnel in support of this PWS. This requirement includes Physical Distribution Division, MARMC Shipping/Receiving Center and ILO MSAT support. In completion of this requirement, the contractor is responsible for performing the following technical requirements/tasks: The contractor will be required to travel in support of out of the area requirements that include inventories, material offload/backload, REMOVE evolutions and DECOMM as determined by COMNAVSURFLANT. The physical location(s) are multiple and varied depending upon the ships availability or location of the warehouse. These may be in addition to the places of performance in para. 7.1; at which time a modification to the contract will be initiated to add the location. Real Time Reutilization Asset Management (RRAM)
The contractor shall provide warehousing, kitting, inventory control; physical material distribution services and ships store room and/or warehouse Wall-to-Wall (W2W) inventories in the performance of this contract. The tasks and duties performed by the contracted support shall include, but are not limited to, Internal FLCN material storage, issuing, kitting, material inventory control, plant/minor property control, material tracking, receipt and inspection, packaging and delivery and/or shipping to include identification and disposition of hazardous, shelf life, Level 1, X-SMIC materials.
The beginning of the document. Download the full file to read on.