Performance Work Statement PPIA JSCG-P RLB Site Development (Equipment)
Updated
A PDF document (505 KB) attached to JSCG-P RLB Site Development– Equipment, from the Department of the Army. Due Nov 18, 2026, 12:00 PM (UTC-6).
File name: PWS_PPIA JSCG-P RLB Site Development (Equipment).pdf
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE WORK STATEMENT (PWS)
Version 1
October 2026
[PPIA JSCG-P RLB Site Development– Equipment]
Part 1
General Information
1. GENERAL: This is a non-personal services contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise any supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S. Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the delivery and maintenance of rental construction equipment at Panama Pacifico International Airport (PPIA) as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property (GFP) and government furnished services (GFS). The contractor shall perform to the standards in this contract.
1.2 Background: U.S. Army troops will conduct construction activities at one (1) designated work area identified in Technical Exhibit 1. The delivery of leased construction equipment, refueling and replenishing support will enable U.S. forces to conduct required construction tasks at Panama Pacifico International Airport (PPIA).
1.3 Objectives: The objective of this requirement is to provide and deliver leased construction equipment and refueling services in support of U.S. Army engineer operations at Panama Pacifico International Airport (PPIA). The contractor shall provide equipment and services only; all construction tasks will be performed by U.S. forces.
1.4 Scope: The Contractor shall provide all materials, labor, equipment, fuel, transportation, and documentation required to deliver leased construction equipment, and refueling services in support of troop construction operations at Panama Pacifico International Airport (PPIA). The project aims to ensure compliance with all applicable Panama and local regulations while prioritizing safety and environmental protection.
1.5 Period of Performance: The period of performance for this contract is from 30 November 2026 to 22 December 2026. If a Contractor’s or Subcontractor’s certification or permit expires, and this causes the
The beginning of the document. Download the full file to read on.