Performance Work Statement and PRS Class of 1961 Reconciliation Plaza
Updated
A PDF document (155 KB) attached to Class of 1961 Reconciliation Plaza Maintenance, from the Department of the Army. Due Nov 20, 2026, 7:00 AM (UTC-5).
File name: PWS_and_PRS_Class_of_1961_Reconciliation_Plaza.pdf
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE WORK STATEMENT (PWS)
The Class of 1961 Reconciliation Plaza Maintenance
2 November 2026
PART 1
GENERAL INFORMATION
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal services contract to provide year-round cleaning and landscape maintenance of the Class of 1961 Reconciliation Plaza.
1.2 Background: The plaza contains sixteen (16) inscribed stone monuments: thirteen (13) within the principal planting bed and three (3) outside it. Other features include rough-cut stone bases, granite edging, mulched planting beds, shrubs, and seasonal annuals. 1.3 Scope: The Contractor shall provide the labor, supervision, plants, mulch, materials, tools, equipment, transportation, and water needed for the services in Part 5. Landscape maintenance applies to the principal planting bed and granite edging. The Contractor shall clean all sixteen (16) monuments during every scheduled service visit, including the three (3) monuments outside the principal bed; landscape maintenance at those three monuments is excluded. Paved pedestrian areas are excluded from cleaning, inspection, and maintenance. The Contractor shall remove and dispose of all waste generated by its work. 1.4 Objectives: The objective of this contract is to provide clean monuments, healthy plantings, neat beds and edging, and a respectful appearance suitable for reunions and public use.
1.5 General Information:
1.5.1 Quality Control: The Contractor shall inspect completed work, correct deficiencies attributable to its performance at no additional cost, and prevent recurrence. No separate quality control plan or recurring quality control report is required. 1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: Work shall not be performed on federally recognized holidays or
The beginning of the document. Download the full file to read on.