Home / Dry Dock Flow Meter Service / Document

Performance Work Statement revfinal Redacted

Updated

A PDF document (139 KB) attached to Dry Dock Flow Meter Service, from the Department of the Navy. Due Nov 12, 2026, 3:00 PM (UTC-10).

File name: 06.A04._PWS_revfinal_Redacted.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT (PWS)

DRY DOCK SIEMENS MAGFLO METER VERIFICATION TEST

AT PEARL HARBOR NAVAL SHIPYARD (PHNSY&IMF)

1.0 BACKGROUND:

1.1 The Siemens MagFlo meter is used by the Temporary Services – Dry Dock Shop and the Occupational Safety, Health and Environment (OSHE) Department to monitor and report dry dock discharges to regulatory agencies, such as the Environmental Protection Agency and Hawaii Department of Health – Clean Water Branch, in accordance with the National Pollutant Discharge Elimination System program.

2.0 OBJECTIVE & SCOPE:

2.1 OVERALL OBJECTIVE: PHNSY&IMF requires a Contractor to provide a technician to perform an annual operational verification test of existing electromagnetic flow meters in dry dock drainage piping. 2.2 SCOPE: The Contractor will provide a manufacturer-authorized technician to conduct a noninvasive flow meter verification test for six (total) Siemens MagFlo meters at the Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY&IMF). PHNSY&IMF must receive an official statement of the verification test results (for each flow meter) within seven days of completing the service.
Model #
Siemens Sitrans FM MAG 5000 series
Siemens Sitrans FM MAG 5000 series
Siemens Sitrans FM MAG 5000 series
Siemens Sitrans FM MAG 5000 series
Siemens Sitrans FM MAG 5000 series
Siemens Sitrans FM MAG 5000 series

Location

3.0 PERFORMANCE REQUIREMENTS:

3.1

The Contractor shall bring all necessary equipment to support the flow verification test and shall provide evidence that the equipment is calibrated and up to date. The verification test should be completed within one working day during normal hours (as defined in paragraph 8.1) and shall not exceed a maximum of seven days in the event of unforeseen delays. If a verification test failure occurs, the Contractor shall re-verify the systems after repairs are made.

3.1.1

The Contractor shall designate a primary and secondary point of contact along with phone numbers to the Contracting Officer’s Representative (COR) and Technical Point of Contact (TPOC). Contractor must notify COR and TPOC of replacement contacts for the duration of the contract.

3.1.2

Technicians must be US citizens. The Government will provide escorts as required while in the Controlled Industrial Area (CIA).

3.2

Contractor shall comply with the latest, current versions of the following documents: Appendix I – Safety and Health Work Practices for Contractors Working with Pearl Harbor Naval

The beginning of the document. Download the full file to read on.