Home / Snow and Ice Removal Services - Brockton, MA (MA006) / Document

Performance Work Statement Snow Removal FY27

Updated

A Word document (58 KB) attached to Snow and Ice Removal Services - Brockton, MA (MA006), from the Department of the Army. Due Nov 10, 2026, 10:00 AM (UTC-5).

File name: PWS-Snow Removal-FY27.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT

Snow and Ice Removal Services
FY 2027
Version 1

1. GENERAL. This is a non-personal services contract to provide snow and ice removal services in support of the 99th Readiness Division (RD). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract services providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The contractor shall not commence until issuance of a task order and notification from the Government COR/RFOS.

1.1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, supplies, supervision, tools, materials, equipment, transportation, fuel and other items necessary to provide snow and ice removal services in accordance with this Performance Work Statement (PWS) except as those items specified as government furnished property and services. The contractor shall perform to the standards in the contract as well as all federal, state and local regulations.

1.2. OBJECTIVE: The result of this contract is to provide a clean workplace free of snow and ice. 1.3. SCOPE. Snow and Ice Removal services are to be performed on all on locations as specified on the site map. 1.4. PERIOD OF PERFORMANCE. The period of performance shall be for 12 months from the effective date of award with four 12-month option periods.

1.5. GENERAL INFORMATION.
1.5.1. QUALITY CONTROL. The contractor shall maintain effective quality control to ensure services are performed in accordance with this PWS. The contractor’s quality control is a means by which he assures himself that his work complies with the requirement of the contract.

1.5.2. QUALITY ASSURANCE. The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). The plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The Government will utilize the snow and ice removal inspection sheet found at Exhibit 2 to document quality of services provided.

1.5.3. HOURS OF OPERATION. The Contractor shall NOT perform any services or work elements under this contract UNLESS NOTIFIED AND INSTRUCTED TO DO SO by the COR/RFOS. Failure to receive prior approval from the COR/RFOS may result in NON-PAYMENT and/or consideration will be requested by the government. The Contractor shall arrive on site and begin performing the services ordered within TWO (2) HOURS OF NOTIFICATION. The Contractor shall maintain contact with the COR/RFOS during snow plowing/sanding/ice removal operations. At the conclusion of the work element the Contractor shall contact the COR/RFOS and state that the job has been completed at which time the COR/RFOS may inspect. The contractor is not to leave the site prior to contacting the COR/RFOS. It shall be presumed that the center will remain open for business during all weather conditions, and that there will be pedestrian and vehicle traffic, truck deliveries, cars parked in the parking lots, and other normal business day activities.

The beginning of the document. Download the full file to read on.

Other documents in this bid