Performance Work Statement Template WL Wire Rope Bangor
Updated
A PDF document (280 KB) attached to Wire Rope Replacement Sources Sought Bangor, from the Department of the Navy. Due Oct 27, 2026, 9:00 AM (UTC-7).
File name: A5 PWS Template WL Wire Rope_Bangor.pdf
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE WORK STATEMENT (PWS)
Wire Rope Replacement on Portal Crane 83 and 85
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to replace the wire rope on all of the hoists on Craft Ward Leonard portal cranes 83 & 85. The Government shall not exercise direct supervision or control over any contractor employees. Notwithstanding, contractor shall ensure employees comply with all requirements of this Performance Work Statement (PWS) and contract. 1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the replacement of wire rope on Craft Ward Leonard portal cranes 83 & 85 as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract. 1.2 Background: This Statement of Work (SOW) outlines the requirements for the replacement of the whip, main, and luffing hoist wire ropes for Craft Ward Leonard portal cranes 83 & 85 located at Naval Base Kitsap, Bangor, Delta Pier. The condition of cranes 83 & 85 are fully operational working cranes. The Contractor shall furnish all materials, labor, supervision, management, tools, equipment, and transportation necessary to perform the services described herein
1.3 Objectives: The primary objective is to safely replace the whip, main, and luffing hoist wire ropes for portal cranes 83 & 85 on site at Naval Base Kitsap, Bangor, Delta Pier to ensure they are fully functional and in normal working condition.
1.4 Scope: Services include removal & disposal, and installation of new wire rope on all of the hoists on Craft Ward Leonard cranes 83 & 85 at TRF Bangor Delta pier. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and nonpersonal services necessary to perform the replacement of wire rope on Craft Ward Leonard portal cranes 83 & 85 .
1.5 Period of Performance: The work shall be completed within 330 calendar days from the issuance date of the task order.
1.6 Quality Control: The contractor shall develop, implement, and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor’s quality control program is the means by which it ensures its work complies with all contract requirements. The QCP shall
The beginning of the document. Download the full file to read on.