PERFORMANCE WORK
STATEMENT
FOR
Wet Well Pumping
PREPARED BY:
66 ABG/CEOES
22 October 2026
CUI
CUI
1. DESCRIPTION OF SERVICES:
1.1. Scope: The contractor shall provide all labor, tools, equipment, hoses, gauges, test equipment, hearing protection, eye protection including prescription safety glasses, materials, supplies and parts, transportation and other incidentals necessary to travel to Hanscom AFB, MA to pump wet wells at Building 1306. The contractor shall be responsible for insuring all services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS).
1.2. Requested Service: Hanscom AFB requires temporary wastewater hauling capabilities to prevent sanitary sewer overflows (SSOs), maintain environmental compliance, and support operational continuity during lift station pump failure, replacement. The objective is to maintain wet well liquid levels at safe operating thresholds continuously until primary pumping system is restored.
1.3 Scope of Work
Services encompass:
1. Continuous 24/7 on-site presence of certified vacuum/tanker truck(s) and qualified operators. 2. Direct suction and extraction of raw sewage and effluent from the designated HAFB lift station wet well(s) at Building 1306
3. Over-the-road transport of domestic wastewater along authorized public transit routes between HAFB and the Town of Lexington municipal discharge location. 4. Safe, controlled discharge into the Town of Lexington receiving pump station in compliance with municipal and state discharge authorizations. 5. Implementation of spill prevention, traffic management, and emergency response protocols.
1.4 Period of Performance (PoP)
The period of performance shall commence immediately upon issuance of the Notice to Proceed (NTP) / Task Order and shall continue uninterrupted 24/7 until official notice of de-mobilization is provided by the Contracting Officer (KO).
1.5 Place of Performance
x
x
Loading Site (Origin): Building 1306 Wet Well, Hanscom Air Force Base, Bedford/Lexington, MA 01731. Offloading Site (Destination): Town of Lexington Pump Station / Lexington, MA.
CUI
1.6 APPLICABLE REGULATIONS AND DIRECTIVES
The Contractor shall adhere to all applicable federal, Department of Defense (DoD), Department of the Air Force (DAF), state, and local standards, including but not limited to: x
x
x
x
x
Air Force Instruction (AFI) 32-1067: Water and Wastewater Systems