Home / Dalton Mountain Multi-Use (DMMU) MAT8 Mover Wall… / Document

PFP Pre-award DMMU SAM Posting - 4 Nov 1

Updated

A Word document (117 KB) attached to Dalton Mountain Multi-Use (DMMU) MAT8 Mover Wall Replacement in Fort Hood, TX, from the Departmental Offices.

File name: B10_PFP_Pre-award_DMMU_SAM_Posting_-_4_Nov_1.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PRE-SOLICITATION NOTICE

Dalton Mountain Multi-Use (DMMU) MAT 8 Replacement
Fort Hood, Texas
Notice ID / Solicitation No.
140D0427R0121 (Future SAM Posting)
Notice Type
Pre-Solicitation
Set-Aside
Service-Disabled Veteran-Owned Small Business (SDVOSB)

NAICS

236220 - Commercial and Institutional Building Construction Size Standard
$45 million
PSC
Z2PZ
Contract Type
Firm-Fixed-Price
Magnitude of Construction
$10 million to $25 million

1. General Information

The U.S. Department of the Interior, Interior Business Center, Acquisition Services Directorate, anticipates issuing a solicitation on behalf of the U.S. Army Installation Management Command, Directorate of Public Works, Fort Hood, Texas, for the Dalton Mountain Multi-Use (DMMU) MAT 8 Replacement project.

This acquisition is anticipated to be conducted as a competitive SDVOSB set-aside. The Government intends to award a single firm-fixed-price construction contract using negotiated procedures and a lowest-price technically acceptable source selection approach. The Government anticipates evaluating an executive summary/technical approach and price. The Government may award without discussions and reserves the right to conduct discussions if determined necessary.

2. Project Description

The requirement is for the design and construction services, labor, supervision, materials, equipment, transportation, and incidentals necessary to repair and modernize the DMMU range at Fort Hood. The work will support the installation’s combat training mission and evolving unit training requirements. The anticipated work includes:
Rapid design planning and development of the work in accordance with the solicitation requirements; Replacement and associated repair work for the DMMU MAT 8 mover wall; Range facility repairs, upgrades, and modernization;
Procurement, fabrication, delivery, installation, testing, and completion of required materials and systems; Compliance with applicable drawings, specifications, codes, safety requirements, quality-control requirements, and site-access procedures; and Up to 20 separately priced optional work items that may be exercised subject to funding and the Government’s determination of need. The final solicitation will define the complete scope, contract line-item structure, technical requirements, drawings, specifications, proposal instructions, and evaluation criteria.

3. Anticipated Schedule and Performance

Milestone
Anticipated Date / Information
Anticipated solicitation release

The beginning of the document. Download the full file to read on.