CORRECTED FINAL (100%) DESIGN

TECHNICAL SPECIFICATIONS

Philpott Dam Stability Analysis and Anchors Design
Henry and Franklin Counties, Virginia

CONTRACT NO. W912PM-20-D-003

TASK ORDER NO. W912PM-23-F0008

Prepared for

US Army Corps of Engineers – Wilmington District

6 NOVEMBER 2025

NOT FOR CONSTRUCTION

Philpott Dam Anchors and Instrumentation

043373

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00

01 20 00

01 30 00

01 32 01.00 10

01 33 00

01 33 16.00 10

01 35 26

01 42 00

01 45 00

01 45 00.15 10

11/20, CHG 4: 08/24
11/20, CHG 4: 08/24
08/23, CHG 1: 08/24
08/18, CHG 4: 02/21
08/23, CHG 1: 05/24

01 50 00

11/20, CHG 3: 08/24

01 57 19

01 58 00

01 74 19

08/19, CHG 5: 08/22
02/19, CHG 3: 11/21

01 78 00

01 78 23

05/19, CHG 1: 08/21

SUMMARY OF WORK

PRICE AND PAYMENT PROCEDURES

ADMINISTRATIVE REQUIREMENTS

PROJECT SCHEDULE

SUBMITTAL PROCEDURES

DESIGN DATA (DESIGN AFTER AWARD)

GOVERNMENTAL SAFETY REQUIREMENTS

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

PROJECT IDENTIFICATION

CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

CLOSEOUT SUBMITTALS

OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 32 13

INSTRUMENTATION HOLE DRILLING AND

SAMPLING

DIVISION 03 - CONCRETE

03 01 00

03 30 53

REHABILITATION OF CONCRETE

MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 50 13

MISCELLANEOUS METAL FABRICATIONS

DIVISION 26 - ELECTRICAL

26 20 00

INTERIOR DISTRIBUTION SYSTEM

DIVISION 31 - EARTHWORK

31 11 00

31 68 13

CLEARING AND GRUBBING

SPILLWAY ANCHORS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 19

08/17, CHG 1: 08/21 SEEDING

DIVISION 33 - UTILITIES

33 51 43

INSTRUMENTATION AND PERFORMANCE

MONITORING OF STRUCTURES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

Philpott Dam Anchors and Instrumentation

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 2

043373

Philpott Dam Anchors and Instrumentation

043373

SECTION 01 11 00

SUMMARY OF WORK

PART 1

1.1
1.1.1

GENERAL

WORK COVERED BY CONTRACT DOCUMENTS

Project Description

The work includes installation of spillway anchors and automated anchor load sensors. Also included are installation of inclinometers in monoliths 9 and 13 and automation of crack gauges and piezometers, and incidental related work.
1.1.2

Location

The work is located at the Philpott Lake Dam in Henry and Franklin Counties, Virginia which is approximately 7 miles north of Bassett, Virginia, as indicated on the drawings.
1.2

OCCUPANCY OF PREMISES

The beginning of the document. Download the full file to read on.