Philpott Dam Specifications-Not For Construction
Updated
A PDF document (2.3 MB) attached to Philpott Anchors and Instrumentation Construction, from the Department of the Army. Due Jan 21, 2029, 9:00 AM (UTC-5).
File name: A21 - Philpott_Dam_Specifications-Not_For_Construction.pdf
The full file is for paid members, or buy this bid alone.
Preview
CORRECTED FINAL (100%) DESIGN
TECHNICAL SPECIFICATIONS
Philpott Dam Stability Analysis and Anchors Design
Henry and Franklin Counties, Virginia
CONTRACT NO. W912PM-20-D-003
TASK ORDER NO. W912PM-23-F0008
Prepared for
US Army Corps of Engineers – Wilmington District
6 NOVEMBER 2025
NOT FOR CONSTRUCTION
Philpott Dam Anchors and Instrumentation
043373
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 20 00
01 30 00
01 32 01.00 10
01 33 00
01 33 16.00 10
01 35 26
01 42 00
01 45 00
01 45 00.15 10
11/20, CHG 4: 08/24
11/20, CHG 4: 08/24
08/23, CHG 1: 08/24
08/18, CHG 4: 02/21
08/23, CHG 1: 05/24
01 50 00
11/20, CHG 3: 08/24
01 57 19
01 58 00
01 74 19
08/19, CHG 5: 08/22
02/19, CHG 3: 11/21
01 78 00
01 78 23
05/19, CHG 1: 08/21
SUMMARY OF WORK
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
DESIGN DATA (DESIGN AFTER AWARD)
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 32 13
INSTRUMENTATION HOLE DRILLING AND
SAMPLING
DIVISION 03 - CONCRETE
03 01 00
03 30 53
REHABILITATION OF CONCRETE
MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 50 13
MISCELLANEOUS METAL FABRICATIONS
DIVISION 26 - ELECTRICAL
26 20 00
INTERIOR DISTRIBUTION SYSTEM
DIVISION 31 - EARTHWORK
31 11 00
31 68 13
CLEARING AND GRUBBING
SPILLWAY ANCHORS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 19
08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 51 43
INSTRUMENTATION AND PERFORMANCE
MONITORING OF STRUCTURES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
Philpott Dam Anchors and Instrumentation
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 2
043373
Philpott Dam Anchors and Instrumentation
043373
SECTION 01 11 00
SUMMARY OF WORK
PART 1
1.1
1.1.1
GENERAL
WORK COVERED BY CONTRACT DOCUMENTS
Project Description
The work includes installation of spillway anchors and automated anchor load sensors. Also included are installation of inclinometers in monoliths 9 and 13 and automation of crack gauges and piezometers, and incidental related work.
1.1.2
Location
The work is located at the Philpott Lake Dam in Henry and Franklin Counties, Virginia which is approximately 7 miles north of Bassett, Virginia, as indicated on the drawings.
1.2
OCCUPANCY OF PREMISES
The beginning of the document. Download the full file to read on.