Plans - NP ACAD BRG
Updated
A PDF document (14.6 MB) attached to Acadia National Park, from the Federal Highway Administration. Due Nov 10, 2026, 2:00 PM (UTC-5).
File name: Plans - NP ACAD BRG(2).pdf
The full file is for paid members, or buy this bid alone.
Preview
PMIS No. 343503
NPS No. 123/197365
PROJECT
N
ck
New Brunsw i
Q
M
u
eb
ec
ai
n
e
ME NP ACAD BRG(2)
U. S. DEPARTMENT OF THE INTERIOR
NATIONAL
PARK
SERVICE
NATIONAL PARK SERVICE
ACADIA NATIONAL PARK
Houlton
INDEX TO SHEETS
SHEET
PLANS FOR PROPOSED PROJECT
DESCRIPTION
NO
A01
Title Sheet
A02-A03
Bangor
ME NP ACAD BRG(2)
Location Map
A05
Survey Information Sheet
REPAIR MAINE ROUTE 233, PARADISE HILL,
A06
Alignment Chain Description
AND FRAZER CREEK BRIDGES
B01-B02
Typical Sections
C01-C03
Tabulation of Quantities
Augusta
Bar Harbor
Project
ME NP ACAD BRG(2)
Portland
C04
HANCOCK COUNTY
MAINE
SCALE IN MILES
Portsmouth
KEY MAP
D01-D02
M01
STATE OF MAINE
DESCRIPTION OF PROJECT
IMPROVEMENT: This work includes reconstruction of asphalt concrete pavement and aggregate base course, placement of
structural backfill, cleaning and removing debris from
weepholes and inlets, cleaning and sealing joints,
erosion repair, repointing mortar joints, placing
Symbols And Abbreviations
A04
Waterville
Maine
re
New Ham pshi
Calais
Construction Sign Summary
Plans
Erosion and Sediment Control Narrative
M02-M03
Erosion and Sediment Control Plans
N01
Temporary Traffic Control Narrative
N02-N04
Temporary Traffic Control Plans
R01-R11
Bridge Plans
S01-S04
Standards And Details
N
ME NP ACAD BRG(2)
waterproofing membrane to improve the service life,
12:40 PM
0.10 Miles
LANE MILES:
ROAD:
WIDTH
Paradise Hill Road (Schedule A)
Paradise Hill Road (Schedule B)
22'
21'
SURFACE
BASE
SUBGRADE
4" ACP
6" AB
Structural
backfill
4" ACP
6" AB
R
Structural
backfill
Know what'sbelow.
Call
before you dig.
Paradise Hill Bridge, Structure No. 1700-010P
Last Date of Inspection - 07/24/2024
BRIDGE:
1-888-344-7233 or www.digsafe.com
Schedule C
Maine Route 233 Bridge, Structure No. 1700-020P
Last Date of Inspection - 07/24/2024
Schedule B
Frazer Creek Bridge, Structure No. 1700-025P
Last Date of Inspection - 07/25/2024
3,774
ADT (2046)
5,608
DHV (2046)
D
%Truck
V (MPH)
C/A
None
e(max)
8%
SCALE IN MILES
F TRAN
SP
TO
EN
E
D
Schedule
Description
Station to Station
Length
RIP Milepost /
(miles)
Cycle #
E
RI
CA
ADT (2026)
DEPAR
TM
DESIGN DESIGNATION:
IT
UN
3 September 2026
Schedule A
PROJECT LENGTH: 0.05 Miles
ON
ATI
RT
O
M:\PROJECTS\acad\BRG(2)\HWY_DES\CADD\A01_ME NP ACAD BRG(2)_ttl.dgn
[Title Sheet NPS]
and other miscellaneous work.
AM
ST
ATES OF
PLANS PREPARED BY
A
Paradise Hill Road
400+96 to 402+46
0.03
MP 1.71 / Cycle 6
B
Paradise Hill Road
204+75 to 206+00
0.02
MP 2.62 / Cycle 6
C
Frazer Creek Bridge
N/A
N/A
MP 0.05 / Cycle 6
SPECIFICATIONS:
The beginning of the document. Download the full file to read on.