Home / Fit Test Machine / Document

PortaCount - Questions and Answers

Updated

A PDF document (251 KB) attached to Fit Test Machine, from the Department of the Air Force. Due Nov 18, 2026, 12:00 PM (UTC-6).

File name: PortaCount - Questions and Answers.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Consolidated Questions and Answers

1. Equipment Specifications & Salient Characteristics

(Consolidated)
•
•

References: Salient Characteristics; SOO
Question: Regarding the required instrument configuration and salient characteristics:
1. Is PortaCount Model 8040 brand-name only, or will an "or equal" quantitative CNC fit tester meeting the Salient Characteristics be considered? Answer: This is a brand name requirement. We are asking for PortaCount Model 8040 specifically.
2. Does the current-production TSI PortaCount Model 8040 bundled with a tablet kit (e.g., Model 8040T) satisfy the requirement for a "touchscreen interface for standalone operation" and permit Bluetooth connectivity via the tablet interface?
Answer: New Porta count Model 8040 without the tablet.
3. Please clarify the standalone operation and data-handling requirements, including the SOO’s restriction on continuous cloud dependence. Answer: The Porta counts are attached to a computer that has the ability to store data and print out results.
4. The solicitation identifies PortaCount Model 8040 as the named equipment, but the Salient Characteristics restrict the maximum weight to 5.0 lbs, whereas TSI’s published specification lists the Model 8040 base instrument at 6.1 lbs. Is the Model 8040 acceptable as configured, and will the weight threshold in the Salient Characteristics be updated accordingly? Answer: This will be corrected via Amendment to the RFQ to remove the weight of the machine.

2. Trade-In Asset Identification & Logistics

•
•

References: CLIN 0001
Question: Regarding the five (5) trade-in units:
1. What are the specific make, model, serial numbers, and current operating condition of the five units to be traded in?
Answer: TSI PortaCountPro 8030 / 8030112602, 8030112002 TSI PortaCount 8030 / 8030192102, 8030192101, 8030082931 2. Will the contractor be required to pack and pick up the trade-in machines onsite at Goodfellow AFB, or will the Government prepare and ship them? Answer: The Government can prep and ship the five trade in units.

3. Equipment Servicing, Repairs, Logistics & Availability •
•

References: CLIN 0002; SOO Section 3, 4–5
Question: Regarding annual factory calibration, maintenance, and ongoing operational availability:
1. Who bears responsibility and freight costs for inbound and outbound shipping between Goodfellow AFB and the factory service facility? Answer: Government
2. To satisfy the SOO continuous availability requirement, is staggered servicing

The beginning of the document. Download the full file to read on.

Other documents in this bid