Western Federal Lands Highway Division
610 E. Fifth Street
Vancouver, WA 98661
Phone 360-619-7700
Fax 360-619-7846

September 16, 2026

NOTICE TO PROSPECTIVE BIDDERS

RE:

AK FLAP ANCHORAGE 2021(1)

Far North Bicentennial Park Enhancements
Solicitation No. 69056726B000012

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After November 1, access will be weather dependent; contact the Municipality of Anchorage for current road conditions at [email protected]. No Federal Highway Administration personnel will be available for show-me tours.
One Schedule and One Option - The work will be solicited under one base schedule and one option schedule. The option schedule will be awarded based on funding availability. See the “Project Description” document posted under “Attachments” on SAM.gov for additional details. • Schedule A consists of 1 bridge and 1 boardwalk with connecting trail work. • Option X consists of 1 additional boardwalk and connecting trail work. Project Location and Type of Work - All project work is in the Far North Bicentennial Park in Anchorage, Alaska along the North Gasline trail.
• Base Schedule
o This work consists of 3 separate work sites. Site 1 work consists of constructing a 80 feet, single span, prefabricated steel pedestrian bridge over Campbell Creek along the North Gasline Trail.
o Site 2 consists of constructing a 61’ boardwalk along the North Gasline Trail. • Option Z
o Site 3 consists of constructing a 51’ boardwalk along the North Gasline Trail. Technical Questions – All technical questions must be submitted by email [email protected] . General Questions - Contact our office at [email protected] or at 360-619-7520.

Preliminary Plans letter

Special Notice - Fall Weed Inspection May be Necessary
The upcoming contract will require unclassified borrow, and aggregate to be secured from commercial sources. These commercial sources must be certified weed free by a federal, state or Public Agency. Commercial certifications may be acceptable if materials have been certified through the North American Weed Free Forage Program standard or a similarly recognized certification process approved by the CO.

Solicitation documents - Documents will be available during the winter of 2026/2027. Please