PreSolNotice 2
Updated
A PDF document (203 KB) attached to GAOA - Rawlins Barracks Replacement, WY, from the Departmental Offices. Due Nov 27, 2026, 5:00 PM (UTC-7).
File name: B01_PreSolNotice_2.pdf
The full file is for paid members, or buy this bid alone.
Preview
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Pre-Solicitation Notice
12 November 2026
Solicitation Number: 140DWF27RL001
Project Identification: GAOA – Rawlins Barracks Replacement, WY Point of Contact: Jonathan Peterson, Contracting Officer, [email protected] Project Location: Rawlins, WY
Estimated Period of Performance: 730 calendar days after issuance of the notice to proceed North American Industry Classification System (NAICS) Code: 236220 / Commercial and Institutional Building Construction
Produce Service Code: Z2AA – Repair or Alteration of Office Buildings Small Business Size Standard: $45M
Solicitation Set-Aside: Total Small Business – Only companies that qualify as a small business under the applicable size standard will be considered.
Solicitation Issuance Date: The BLM anticipates issuing a subsequent request for proposals (RFP) in early December 2026.
Registration Requirements: Prospective offerors must have a Unique Entity ID (UEI) and an active System for Award Management (SAM) profile.
Site Visit: Yes – Approximately 1-2 weeks after the issuance of the RFP. Project Description: The Bureau of Land Management (BLM) has a construction requirement which consists of all labor, materials, equipment, and supervision to construct two (2) crew quarters buildings and associated site development work within BLM property at 906 West Davis Street, Rawlins WY. The project is intended to replace and improve barracks capacity supporting BLM field operations in Rawlins, Wyoming. In addition to construction of the two crew quarters buildings, the requirement includes the associated site work, utility connections, access, grading, drainage, and other improvements necessary to deliver complete, functional facilities. The contractor will be responsible for coordinating labor, materials, equipment, supervision, scheduling, quality control, and site safety throughout performance, with the objective of completing the work in accordance with the contract documents and applicable federal, state, and local requirements.
The beginning of the document. Download the full file to read on.