Home / Process Gases, Hill Air Force Base / Document

Process Gases BPA Statement of Work

Updated

A PDF document (365 KB) attached to Process Gases, Hill Air Force Base, from the Department of the Air Force. Due Nov 30, 2026, 1:00 PM (UTC-7).

File name: Process Gases BPA Statement of Work.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK (SOW)

Process Gases BPA

10/28/2026

1|Page

1.0

2.0

3.0

4.0

5.0

6.0

7.0

2|Page

1.0 PURPOSE

The Ogden Air Logistics Complex (OO-ALC) has the need to establish a five (5) year Blanket Purchase Agreement (BPA) for the delivery of various compressed gases, cryogenic fluids, microbulk tank filling, and empty compressed cylinder collection throughout Hill Air Force Base (HAFB).

2.0 BACKGROUND

The gases and cryogenic fluids are used to support calibrations and equipment testing for multiple Air Force (AF) industrial processes including various workload processes and laboratory testing and in support of all weapon systems maintained or repaired at Hill AFB.

3.0 OBJECTIVES

The contractor shall perform the delivery, bulk refill, microbulk tank refills/initial fills, and exchange of the gases listed in Appendix B on an as needed basis. The customer will place a service call when bulk gas tanks are ready to be filled, or the canisters are ready to be exchanged including microbulk tanks, compressed cylinder gases, and cryogenic fluids that are needed and/or empty cylinders requiring pickup. The customer will provide the delivery address for the canisters, compressed cylinders, and/or cryogenic fluids to be exchanged. The customer will also provide which bulk gas tanks, and/or microbulk tanks require filling when they place the service call.
•

•

•
•
•
•
•
•
•

The contactor shall be responsible for planning and scheduling all site visits with the OOALC point of contact (POC) (EESOH-MIS HDSC Operator) or the maintenance supervisor when the service call is placed.
The contractor shall provide a quote within one (1) business day of it being requested by an authorized caller. A business day is considered to be Monday through Friday excluding official Government holidays.
The contractor shall not provide any services without prior written authorization. The contractor shall perform the required services within one (1) week of the service call or on the day/time arranged when the service call is placed. The contractor shall perform emergency services within one (1) business day of the service call.
The contractor shall provide new or reconditioned gas canisters/cylinders that are equal to or greater than the original equipment manufacturers (OSHA)/(DOT) recommended specifications.
The contractor shall be responsible for transporting, loading, unloading, and moving all parts and equipment necessary to perform this service.
The contractor shall be responsible for providing all tools, labor, parts, equipment, and

The beginning of the document. Download the full file to read on.

Other documents in this bid