Home / AK NPS Dena 10(64), Re-pave Riley Creek Campground Roads / Document

Project Description AK NPS DENA 10

Updated

A PDF document (272 KB) attached to AK NPS Dena 10(64), Re-pave Riley Creek Campground Roads, from the Federal Highway Administration.

File name: Project Description_AK NPS DENA 10(64).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

AK NPS DENA 10(64), Re-pave Riley Creek CG Roads
Municipality of Anchorage County, AK

This work consists of: Aggregate base, paving, striping and pavement repairs of the Riley Creek Campground in Denali National Park and Pavement repairs along the park Road. Project Location: This project is located approximately 125 Miles SW of Fairbanks, AK. Project Length: 2.02 Miles
Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: Fall 2026/ Winter 2027
Tentative Fixed Completion Date: Fall 2027

DESCRIPTION OF WORK in US CUSTOMARY UNITS

One Schedule
Sch Name

_BASE

USING FP-24 SPECS

DIVISION 150 – Project
Requirements
152 Construction Survey & Staking
(yes/no)
153 Contractor Quality Control and Assurance
(yes/no)
154 Contractor Sampling & Testing (yes/no)

Yes
Yes
Yes

One Schedule
Sch Name

_BASE

155 Schedules for Construction Contracts
(construction schedules)
(yes/no)
157 Soil Erosion & Sediment Control (Fiber
Roll)

Yes

4993 LNFT

DIVISION 200 – Earthwork
204 Roadway Excavation
204 Subexcavation
204 Select Borrow
204 Remove and reset boulder
207 Stabilization Geotextile

8000 CUYD

2500 CUYD

1500 CUYD

12 Each

31000

SQYD

DIVISION 300 – Aggregate and
Base Courses
302 Roadway Agg

7000 CUYD

315 Recycled Aggregate Base

1000 CUYD

DIVISION 400 – Asphalt
pavements and surface
treatments
403 Asphalt Concrete Pavement
412 Tack Coat
413 Asphalt Milling

6000 TONS

20 Tons

17500

SQYD

DIVISION 600 – Incidental
Construction
604 Manhole Adjustments
605 Underdrain
607 Culvert Cleaning
619 Remove and reset bollard
619 remove and reset gate

10 Each

700 LNFT

5 each

107 each

4 each

One Schedule
Sch Name

_BASE

622 Rental Equipment
623 General Labor
633 Remove and Reset Sign system
634 Pavement markings
635 Temporary Traffic control, barricade
634 Temporary Traffic control, Tubular Marker
634 Temporary Traffic control, Construction
Signs
634 Temporary Traffic control, Flagger
635 Temporary Traffic control, TCS
646 Remove and reset Trash Receptacle

Yes
Yes

41 each

12000 LNFT

+ 1 symbol

10 each

50 each

400 SQFT

750 HR
120 Days

12 each

The beginning of the document. Download the full file to read on.

Other documents in this bid