PROJECT DESCRIPTION WA ERFO FS MTBKR605 2020-1

Updated

A PDF document (187 KB) attached to WA ERFO FS MTBKR605 2020-1(2), Forest Road 7810 MP 0.1 Repair, from the Federal Highway Administration.

File name: PROJECT DESCRIPTION_WA ERFO FS MTBKR605 2020-1(2).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

WA ERFO FS MTBKR605 2020-1(2), Forest Road 7810 MP 0.1 Repair Mt. Baker-Snoqualmie National Forest, Pierce County, Washington This requirement is for a construction project located near the Forest Service Road 7810 bridge along the Carbon River, 22 miles south of Enumclaw, WA. Construction will be in the Mt. Baker-Snoqualmie National Forest near the boundary of Mt. Rainier National Park. The work includes bank stabilization and stream diversion.
Project length: 0.05 miles
Tentative Fixed Completion Date: Fall 2027
(Once solicitation is issued, see SF1442 Continuation, Block 11 for exact date.) Tentative Solicitation Date: Spring 2027
Estimated Price Range: $700,000 to $2,000,000
Location: 22 miles south of Enumclaw, WA

Base Schedule

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-24

DIVISION 150 – Project
Requirements
152 Construction Survey & Staking (yes/no)
153 Contractor Quality Control and Assurance
(yes/no)
A154 Contractor Sampling & Testing
(yes/no)
155 Schedules for Construction Contracts
(construction schedules)
(yes/no)
157 Soil Erosion & Sediment Control (erosion
control devices)
Fiber Roll

Yes
Yes
Yes
Yes

300 LNFT

DIVISION 600 – Incidental
Construction
623 Special Labor, Hired Technical Services,
Biological Services (Bird Survey)

10 HOUR

Base Schedule

626 Plants, Trees, Shrubs, Vines &
Groundcovers
Cuttings, Alder or Willow Pole
628 Temporary Stream Diversion
635 Temporary Traffic Control – Flagger
635 Temporary Traffic Control – Traffic Control
Supervisor
635 Temporary Traffic Control
Signs and devices
647 Environmental Mitigation (use pay item
description)
Log Barrier
Root Wad
Bank Stabilization (Untreated Timber Pile)
Streambed Material
Bank Stabilization (Coarse Woody Debris)

0.16 ACRE

YES

(LPSM)

500 HOUR

50 DAY

YES

(LPSM)

1560

The beginning of the document. Download the full file to read on.