Project Description WA ERFO NPS OLYM 2022-1
Updated
A PDF document (260 KB) attached to WA ERFO NPS OLYM 2022-1(3), Olympic NPS ERFO Repairs 2022 Road 107 MP 0.3 to 0.5 & MP 0.8, from the Federal Highway Administration.
File name: Project Description_WA ERFO NPS OLYM 2022-1(3).pdf
The full file is for paid members, or buy this bid alone.
Preview
WA ERFO NPS OLYM 2022-1(3), OLYMPIC
NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
Jefferson County, WA
This work consists of: Bank stabilization, riprap, engineered log jam with dolosse. Project Location: This project is located approximately 26 Miles SE of Forks, WA. Project Length: 0.12 Miles
Estimated Price Range: Between $2,000,000 and $5,000,000 Tentative Solicitation Date: Fall 2026/ Winter 2027
Tentative Fixed Completion Date: Fall 2027
DESCRIPTION OF WORK in US CUSTOMARY UNITS
One Schedule
Sch Name
A
Additional Sch
Sch Name
B
USING FP-24 SPECS
Yes
Yes
DIVISION 150 – Project
Requirements
152 Construction Survey & Staking
(yes/no)
153 Contractor Quality Control and
Assurance
(yes/no)
154 Contractor Sampling & Testing (yes/no)
One
Additional
Schedule Sch Sch
Sch Name
Name
A
B
Yes
Yes
Yes
Yes
155 Schedules for Construction Contracts
(construction schedules)
(yes/no)
Yes
Yes
157 Soil Erosion & Sediment Control (Fiber
Roll)
DIVISION 200 – Earthwork
330 LNFT
330 LNFT
201 Clearing & Grubbing
1400 SQYD 1400 SQYD
204 Boulder
DIVISION 250 – Slope
Reinforcement and Retaining Walls
80 EACH
80 EACH
251 Placed Riprap, Class 4
790 CUYD
790 CUYD
251 Placed Riprap, Class 5
260 CUYD
260 CUYD
622 Rental Equipment
(yes/no)
Yes
Yes
623 General Labor
(yes/no)
Yes
Yes
625 Turf Establishment
(indicate seeding or mulching separately)
840 SQYD
840 SQYD
626 Mulching
1600 SQYD 1600 SQYD
626 Plantings (Government-Furnished)
LPSM
LPSM
628 Temporary Stream Diversion
LPSM
LPSM
629 Rolled Erosion Control Product
635 Temporary Traffic Control –
GovernmentFurnished Kiosk)
1300 SQYD 1300 SQYD
LPSM
LPSM
635 Temporary Traffic Control – Tubular
Marker
40 EACH
40 EACH
635 Temporary Traffic Control – Drum
15 EACH
15 EACH
635 Temporary Traffic Control – Warning
Light
Type B
635 Temporary Traffic Control – Pavement
Markings
6 EACH
6 EACH
80 LNFT
80 LNFT
80 LNFT
80 LNFT
635 Temporary Traffic Control – Pavement
Markings Removal
635 Temporary Traffic Control –
Construction Sign
190 SQFT
635 Temporary Traffic Control – Flagger
1000 Hour
1000 Hour
635 Temporary Traffic Control – Traffic
Control
Supervisor
647 Environmental Design, Root Wad
50 Day
50 Day
6 EACH
6 EACH
4 EACH
0 EACH
0 EACH
4 EACH
647 Environmental Design, Bank
Stabilization
(Engineered Log Jam with Dolosse)
647 Environmental Design, Bank
Stabilization
(Engineered Log Jam with DolosseTextured)
190 SQFT
The beginning of the document. Download the full file to read on.