Home / WA ERFO NPS OLYM 2022-1(3), Olympic NPS ERFO Repairs 2022… / Document

Project Description WA ERFO NPS OLYM 2022-1

Updated

A PDF document (260 KB) attached to WA ERFO NPS OLYM 2022-1(3), Olympic NPS ERFO Repairs 2022 Road 107 MP 0.3 to 0.5 & MP 0.8, from the Federal Highway Administration.

File name: Project Description_WA ERFO NPS OLYM 2022-1(3).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

WA ERFO NPS OLYM 2022-1(3), OLYMPIC

NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8

Jefferson County, WA

This work consists of: Bank stabilization, riprap, engineered log jam with dolosse. Project Location: This project is located approximately 26 Miles SE of Forks, WA. Project Length: 0.12 Miles
Estimated Price Range: Between $2,000,000 and $5,000,000 Tentative Solicitation Date: Fall 2026/ Winter 2027
Tentative Fixed Completion Date: Fall 2027

DESCRIPTION OF WORK in US CUSTOMARY UNITS

One Schedule
Sch Name
A

Additional Sch
Sch Name
B

USING FP-24 SPECS

Yes

Yes

DIVISION 150 – Project
Requirements
152 Construction Survey & Staking

(yes/no)

153 Contractor Quality Control and
Assurance
(yes/no)
154 Contractor Sampling & Testing (yes/no)

One
Additional
Schedule Sch Sch
Sch Name
Name
A
B
Yes
Yes
Yes

Yes

155 Schedules for Construction Contracts
(construction schedules)
(yes/no)

Yes

Yes

157 Soil Erosion & Sediment Control (Fiber
Roll)
DIVISION 200 – Earthwork

330 LNFT

330 LNFT

201 Clearing & Grubbing

1400 SQYD 1400 SQYD

204 Boulder
DIVISION 250 – Slope
Reinforcement and Retaining Walls

80 EACH

80 EACH

251 Placed Riprap, Class 4

790 CUYD

790 CUYD

251 Placed Riprap, Class 5

260 CUYD

260 CUYD

622 Rental Equipment

(yes/no)

Yes

Yes

623 General Labor

(yes/no)

Yes

Yes

625 Turf Establishment
(indicate seeding or mulching separately)

840 SQYD

840 SQYD

626 Mulching

1600 SQYD 1600 SQYD

626 Plantings (Government-Furnished)

LPSM

LPSM

628 Temporary Stream Diversion

LPSM

LPSM

629 Rolled Erosion Control Product
635 Temporary Traffic Control –
GovernmentFurnished Kiosk)

1300 SQYD 1300 SQYD

LPSM

LPSM

635 Temporary Traffic Control – Tubular
Marker

40 EACH

40 EACH

635 Temporary Traffic Control – Drum

15 EACH

15 EACH

635 Temporary Traffic Control – Warning
Light
Type B
635 Temporary Traffic Control – Pavement
Markings

6 EACH

6 EACH

80 LNFT

80 LNFT

80 LNFT

80 LNFT

635 Temporary Traffic Control – Pavement
Markings Removal
635 Temporary Traffic Control –
Construction Sign

190 SQFT

635 Temporary Traffic Control – Flagger

1000 Hour

1000 Hour

635 Temporary Traffic Control – Traffic
Control
Supervisor
647 Environmental Design, Root Wad

50 Day

50 Day

6 EACH

6 EACH

4 EACH

0 EACH

0 EACH

4 EACH

647 Environmental Design, Bank
Stabilization
(Engineered Log Jam with Dolosse)
647 Environmental Design, Bank
Stabilization
(Engineered Log Jam with DolosseTextured)

190 SQFT

The beginning of the document. Download the full file to read on.

Other documents in this bid